FIELD: mining.
SUBSTANCE: weakening a spring of natural balance at both sides of the block and damaging a key stone is done simultaneously by exploding rows of parallel wells drilled at the borders with interchamber sight pillars and along the axial line of the stope, in sections length of which is equal to the thickness of the damaged layer. Weakening of the spring at both sides of the block and damaging of the key stone is done by sectional explosion of clusters of parallel adjacent wells: linear ones at borders with interchamber sight pillars and bulk ones along the axial line of the block. The spring at both sides of the block is weakened ahead of erection of artificial interchamber sight pillars.
EFFECT: improved efficiency and safety of production works.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING ORE DEPOSITS | 0 |
|
SU1169410A1 |
UNDERGROUND MINERAL MINING METHOD | 2005 |
|
RU2306417C2 |
ROCK PRESSURE CONTROL METHOD | 2010 |
|
RU2454540C1 |
METHOD OF EXTRACTION OF MINERALS OF PILLARS | 2015 |
|
RU2610456C1 |
UNDERGROUND HARD ROCK MINERALS FIELDS DEVELOPMENT METHOD | 2008 |
|
RU2379513C1 |
METHOD OF MINING OF MINERAL DEPOSITS | 2001 |
|
RU2204718C2 |
METHOD OF CONTROLLING ROCK PRESSURE DURING UNDERGROUND DEVELOPMENT OF HORIZONTAL AND INCLINED LENTICULAR ORE DEPOSITS | 2015 |
|
RU2593667C1 |
METHOD FOR UNDERGROUND MINING OF VEIN DEPOSITS | 2011 |
|
RU2487998C2 |
PILLAR WORKING METHOD | 0 |
|
SU1793053A1 |
METHOD OF DEVELOPING THICK ORE DEPOSITS BY UNDERGROUND MINING WITH INTERCHAMBER PILLARS SUPPORT | 2009 |
|
RU2405109C1 |
Authors
Dates
2012-03-20—Published
2010-07-07—Filed