FIELD: oil and gas industry.
SUBSTANCE: according to the method, vertical and horizontal injection and producing wells are drilled, horizontal injection wells are drilled in parallel to the oil pool outline and/or lines of collector substitution and at least 70 metres inside the deposit from the lines specified in plan. The bottomhole of the previous well and the point of entry into the bed of the subsequent well are arranged at the distance from each other of at least 50 m. The horizontal bore is drilled with length of at least 2 distances of the confirmed grid of wells. Products are taken via producing wells. The working fluid is pumped via injection wells. Whenever the bed pressure drops below the values of 80% from the initial one and/or during watering of horizontal wells started for production, more than 90% of them are placed under injection, displacing oil to the centre of the deposit and from zones of substitution to a non-collector into a zone of collectors development.
EFFECT: improved oil recovery of the deposit.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL DEPOSIT DEVELOPMENT | 2011 |
|
RU2439299C1 |
MULTI-FORMATION OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2459069C1 |
METHOD OF DEVELOPING OIL DEPOSITS | 2015 |
|
RU2580562C1 |
DEVELOPMENT OF MINOR OIL DEPOSITS | 2013 |
|
RU2524703C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS COMPLICATED WITH VISEAN EROSIONAL DOWNCUTS | 2005 |
|
RU2298087C1 |
DEVELOPMENT METHOD OF SMALL DEPOSITS AND SEPARATE LENSES OF OIL DEPOSIT | 2018 |
|
RU2696688C1 |
DEVELOPMENT METHOD FOR FOUR PRODUCTION FACILITIES OF MULTILAYER OIL DEPOSIT | 2013 |
|
RU2527957C1 |
METHOD FOR EXTRACTING OIL DEPOSIT IN HETEROGENEOUS COLLECTOR OF LOW THICKNESS | 2006 |
|
RU2290498C1 |
METHOD OF DEVELOPMENT OF STRATIFIED OIL DEPOSIT WITH HIGH-VISCOSITY OIL | 2014 |
|
RU2563463C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT COMPLICATED WITH VERTICAL RUPTURE | 2010 |
|
RU2431740C1 |
Authors
Dates
2012-04-10—Published
2011-05-27—Filed