FIELD: construction, road engineering.
SUBSTANCE: invention relates to construction of earth works erected on loose natural bases, including a road earth bed, preferably for a railway or a motor road. The method to strengthen a loose natural base to erect a road earth bed on collapsing soils of high capacity includes arrangement of a reinforcement device in a loose base soil in the form of ground piles, every of which represents a protective shell filled with a draining material, and subsequent surface vibratory compaction in a controlled mode with filling of sand or sand and gravel mixture between piles into a pile-to-pile space reinforced with a textile fabric, besides, control of the vibratory compaction mode by variation of vibration load parameters is carried out depending on condition of deformation and strength characteristics of a compacted soil determined as a result of systematic calculation of a soil safety coefficient, and monitoring stresses in the pile-to-pile space from vertical loads that occur in process of vibratory compaction and horizontal load that occur as soil piles expand in a protective shell. To speed up consolidation of the base soil and reduce time of soil subsidence in process of surface vibratory compaction of the pile-to-pile space, the vibration load parameters are varied until the soil safety coefficient reaches the maximum possible value of load against the base, and are maintained at a level permissible by the safety coefficient value.
EFFECT: higher reliability of earth bed base due to its strengthening (reinforcement) in the controlled mode.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF EARTHWORK FABRIC ON WEAK NATURAL BASIS | 2007 |
|
RU2337205C1 |
METHOD FOR REINFORCEMENT OF RAILWAY ROAD BED ON WEAK BASE | 2015 |
|
RU2593282C1 |
ROADBED AND ROADBED FORMING METHOD | 2005 |
|
RU2273687C1 |
METHOD OF ENHANCING NATURAL BASE FORMED BY WEAK SOILS FOR ROAD BED ERECTION | 2015 |
|
RU2598665C1 |
PORT STRUCTURE | 1996 |
|
RU2117091C1 |
EARTHWORK ON PERMAFROST SOILS AND METHOD OF ITS ERECTION WITH BASE REINFORCEMENT IN AREAS OF PERMAFROST PROPAGATION | 2010 |
|
RU2443828C1 |
METHOD FOR CONSTRUCTION OF FLOATING BODY OF ROAD | 2013 |
|
RU2547193C1 |
MOTOR ROAD AT PERMAFROST GROUNDS | 2019 |
|
RU2732774C1 |
METHOD FOR STRENGTHENING OF SLOPES AND SLOT MAKER FOR ITS REALISATION | 2008 |
|
RU2371547C1 |
FOUNDATION FOR BUILDING OR STRUCTURE | 0 |
|
SU1294919A1 |
Authors
Dates
2012-04-27—Published
2010-11-26—Filed