FIELD: construction engineering. SUBSTANCE: this particularly relates to erection of port structures on loose ground. With purpose of reducing cost of load-bearing ground bed it is being made in the form of silt-cement reinforced embankment. Aforesaid arrangement can reduce cost of erecting port structures and improve ecology. EFFECT: higher efficiency. 1 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| METHOD FOR ERECTION OF EMBANKMENT | 2008 |
|
RU2384668C1 |
| METHOD OF RECONSTRUCTION OF BERTHING FACILITIES | 2000 |
|
RU2180028C2 |
| METHOD FOR TRESTLE-TYPE BERTH STRUCTURE RECONSTRUCTION | 2003 |
|
RU2281358C2 |
| MOORING EMBANKMENT OF VERTICAL TYPE | 2018 |
|
RU2690426C1 |
| LANDSLIDE CONTROL STRUCTURE | 1997 |
|
RU2122072C1 |
| HAWSER STRUCTURE | 1994 |
|
RU2068045C1 |
| MOORING STRUCTURE | 1998 |
|
RU2136814C1 |
| SHEET-PILE WALL | 2006 |
|
RU2308573C1 |
| METHOD FOR BERTH STRUCTURE RECONSTRUCTION | 2003 |
|
RU2259441C1 |
| PRESTRESSED SHALLOW FOUNDATION | 2010 |
|
RU2464381C2 |
Authors
Dates
1998-08-10—Published
1996-10-04—Filed