FIELD: oil and gas industry.
SUBSTANCE: invention refers to oil industry and can be used for creating optimal thermal rate in oil producing wells and oil pipelines for preventing asphalt-resin-paraffin deposits in production tubing of oil wells and oil pipelines. Method of thermal rates regulation in oil wells and oil pipelines includes descending of cable with heating element into production tubing at a depth where the temperature of oil well fluid is above the point of paraffin-hydrates crystallisation. Cable heating element is connected to the controlled power supply. Note that heating element evolves specific power along production tubing. Temperature calculation of the heating element by control system for its protection and control is carried out according to the provided mathematical expression.
EFFECT: minimisation of consumed power at reaching well optimal operation, increase of reliability and decrease of operation costs.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
OIL HEATING DEVICE | 2004 |
|
RU2263763C1 |
OIL HEATING SYSTEM | 2014 |
|
RU2563007C1 |
METHOD FOR HEAT LOSS COMPENSATION IN OIL WELL | 2003 |
|
RU2305174C2 |
METHOD AND DEVICE FOR OIL AND GAS WELL DEWAXING | 2004 |
|
RU2273725C2 |
AUTONOMOUS HYBRID COMPLEX FOR ASPHALT-RESIN-PARAFFIN DEPOSITS CONTROL IN OIL WELL | 2018 |
|
RU2703040C1 |
METHOD OF FLUID FLOW HEATING IN OIL AND GAS WELL AND INSTALLATION FOR ITS IMPLEMENTATION | 2010 |
|
RU2455461C1 |
PUMPING UNIT OF AN OIL-PRODUCING WELL | 2020 |
|
RU2754053C1 |
METHOD OF ELIMINATION AND PREVENTION OF FORMATION OF ASPHALTENE-RESIN-PARAFFIN DEPOSITS IN OIL WELLS AND OIL PIPELINES AND PLANT FOR ITS IMPLEMENTATION | 2011 |
|
RU2475627C1 |
CABLE FIXING DEVICE | 2023 |
|
RU2820328C1 |
METHOD OF OIL WITHDRAWAL FROM HIGH GAS CONTENT WELL AND ELECTROLOADING EQUIPMENT FOR IT | 2007 |
|
RU2380521C2 |
Authors
Dates
2012-04-27—Published
2010-08-13—Filed