FIELD: construction.
SUBSTANCE: erosion-preventive structure is arranged in the form of a multi-staged fall. Near fall stages there are several bottom sills arranged from rows of heavy fascines of biopositive design laid across a channel and normally to the direction of a surface water flow. Thresholds from heavy fascines are arranged at a certain distance from each other along the entire washed section of the ravine, and are made of three or more rows laid tightly into a horizontal layer of heavy fascines. Along coastal slopes of the ravine above the top of fascine thresholds, light fascines are laid in parallel rows as one layer to the level of the matted ground surface and in direction of the water flow, and on top of those there is a gabion net attached to slopes and to a metal net of heavy fascines.
EFFECT: invention provides for recovery of ravines and other washed sections of eroded lands.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ERECT EROSION-PREVENTIVE STRUCTURE OF BIOPOSITIVE DESIGN | 2010 |
|
RU2449078C2 |
ANTIEROSION STRUCTURE OF BIOPOSITIVE DESIGN FOR RECOVERY OF RAVINES | 2014 |
|
RU2565264C1 |
METHOD OF ERECTION OF ANTIEROSION STRUCTURE OF BIOPOSITIVE DESIGN FOR RECOVERY OF RAVINES | 2014 |
|
RU2565258C1 |
METHOD FOR CONSTRUCTION OF ANTI-EROSION LINING USING FLEXIBLE MATTRESSES | 2022 |
|
RU2800940C1 |
ANTI-EROSION LINING MADE OF FLEXIBLE MATTRESSES | 2022 |
|
RU2800939C1 |
METHOD FOR ERECTING ANTI-EROSION FASTENING OF BIOPOSITIVE STRUCTURE | 2020 |
|
RU2758239C1 |
SLOPE FIXTURE OF BIOPOSITIVE DESIGN FASCINES | 2009 |
|
RU2399718C1 |
DAM OF BIOPOSITIVE DESIGN | 2010 |
|
RU2451130C2 |
METHOD FOR ERECTION OF SLOPE SUPPORT FROM FASCINES OF BIOPOSITIVE DESIGN | 2009 |
|
RU2398930C1 |
COASTAL FIXTURE FROM FASCINES AND GABION METS OF BIOPOSITIVE DESIGN | 2014 |
|
RU2565738C1 |
Authors
Dates
2012-05-20—Published
2010-03-03—Filed