FIELD: construction.
SUBSTANCE: dam comprises a reinforcing latticed frame attached to concrete anchors and heavy fascines. Inside the reinforcement frame there are heavy fascines laid as alternating in rows along and across. The first layer is made of heavy fascines laid in dense layers along the dam axis in its entire width and normally to direction of the main river flow. The second layer is made from rows of heavy fascines laid in direction of the flow and normally to rows of the first layer. The third and subsequent layers of heavy fascines are arranged in the same manner, at the same time the upper row of heavy fascines is laid normally to the direction of water flow.
EFFECT: higher efficiency of structure operation and recovery of nature conservation green zones along riverbeds.
2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ERECT DAM OF BIOPOSITIVE DESIGN | 2010 |
|
RU2449080C2 |
SLOPE FIXTURE OF BIOPOSITIVE DESIGN FASCINES | 2009 |
|
RU2399718C1 |
DAM DIKE OF COMPOSITE DESIGN | 2006 |
|
RU2336388C2 |
METHOD FOR BIO-POSITIVE SHORE REVETMENT | 2006 |
|
RU2319806C2 |
METHOD FOR BIO-POSITIVE SPUR DIKE ERECTION | 2006 |
|
RU2319805C2 |
MANUFACTURING METHOD OF HEAVY FASCINES OF BIOPOSITIVE CONSTRUCTION | 2008 |
|
RU2369687C1 |
COASTAL FIXTURE FROM FASCINES AND GABION METS OF BIOPOSITIVE DESIGN | 2014 |
|
RU2565738C1 |
COMBINED DRAINAGE OF BIOPOSITIVE DESIGN | 2009 |
|
RU2400596C1 |
METHOD TO ERECT COASTAL SUPPORT FROM FASCINES OF BIOPOSITIVE DESIGN | 2014 |
|
RU2569828C1 |
EROSION-PREVENTIVE STRUCTURE OF BIOPOSITIVE DESIGN | 2010 |
|
RU2451129C2 |
Authors
Dates
2012-05-20—Published
2010-03-03—Filed