PLANT AND METHOD FOR ELECTRO-IMPULSE DRILLING AND LOGGING AND DEVICE FOR ELECTRO-IMPULSE DRILLING (VERSIONS) Russian patent published in 2012 - IPC E21B7/15 

Abstract RU 2454524 C2

FIELD: mining.

SUBSTANCE: plant for drilling and logging includes electro-impulse drilling device, at least one sonic-signal sensor and at least one electromagnetic signal sensor; the signals are generated by device for electro-impulse drilling. At that sonic-signal sensors are adapted to measure three vectors of displacement and one component of pressure. Besides the plant includes dipole electrodes silver-silver-chloride and spools with ferromagnetic core to measure electric and magnetic signals on surface or seabed, and coil antenna to measure electromagnetic signals in borehole. Method for drilling and logging and device for electro-impulse drilling are also proposed.

EFFECT: effective electro-impulse drilling with simultaneous logging of well.

13 cl, 3 dwg

Similar patents RU2454524C2

Title Year Author Number
SYSTEM FOR DOUBLE-SIDED TELEMETRY OF DRILL STRING FOR MEASUREMENT AND CONTROL OF DRILLING 2006
  • Li Tsimin
  • Klark Brajan
  • Mekhta Shijam B.
  • Jutehn Remi
  • Rid Kristofer P.
  • Santoso Dehvid
  • Khvatum Liz
  • Madkhavan Ragkhu
  • Follini Zhan-Mark
  • Daunton Dzheffri K.
  • Ehldred Uolter D.
RU2413841C2
METHOD OF ELIMINATING PARASITIC EFFECT OF CONDUCTING DRILL PIPES ON RESULTS OF MEASURING TRANSIENT ELECTROMAGNETIC COMPONENTS WHEN DRILLING 2005
  • Itskovich Gregori B.
RU2377607C2
ACOUSTIC INSULATOR FOR IMPLEMENTATION INSIDE BOREHOLE 2005
  • Ehgerev Sergej
  • T'Jutekin Viktor
  • Jushin Viktor
  • Dubinskij Vladimir
  • Bol'Shakov Aleksej
  • Belov Vladimir
RU2362189C2
WELL SHAFT DRILLING SYSTEM AND METHOD FOR IMPLEMENTING WELL SHAFT DRILLING OPERATIONS 2007
  • Paj Satish
  • Moriarti Kejt
  • Daunton Dzheff
  • Zemlak Uorren
  • Rok Devin
  • Mattik Dzhonatan
  • Ehjdelung Denni
RU2443844C2
DRILL BIT FOR ELECTROMAGNETIC MEASUREMENTS IN UNDERGROUND BED 2011
  • Bittar Majkl
  • Dirksen Ronal'D Jokhannes
RU2571316C1
METHOD TO DETERMINE FEATURES OF BEDS, REALISATION OF NAVIGATION OF DRILLING TRAJECTORIES AND PLACEMENT OF WELLS WITH REGARD TO UNDERGROUND DRILL WELLS 2010
  • Sejdu Zhan
  • Chou Juk Kha
RU2542026C2
METHOD FOR USING PAUSES IN BORING PROCESS FOR PERFORMING MEASUREMENTS OF GEOLOGICAL LAYER CHARACTERISTICS, DEVICE FOR PERFORMING MEASURINGS OF GEOLOGICAL LAYER CHARACTERISTICS, METHOD FOR CHANGING ORDER OF DATA COLLECTION 1999
  • Krehri Stiven F.
  • Khajdler Ral'F
  • Pojtzh Martin E.
  • Esmersoj Kengiz
RU2229023C2
HYDRAULIC FRACTURING METHOD OF UNDERGROUND FORMATIONS DURING THEIR DRILLING 2008
  • Dzhonson Ehshli
  • Dzheffrajs Bendzhamin P.
  • Braun Dzh. Ehrnest
RU2502866C2
CALCULATION OF DRILLING SPEED AND DEPTH FOR BOREHOLE TOOLS 2013
  • Sugiura Dzuniti
RU2582608C1
DRILLING WITH PRESSURE OPTIMISATION BY CONTINUOUS DRILLING STRING OF LIFTING PIPES 2011
  • Majda Dzhon L. Ml.
  • Skinner Nil Dzh.
RU2565299C2

RU 2 454 524 C2

Authors

Rosten Tage

Bolas Trond

Dates

2012-06-27Published

2008-02-07Filed