FIELD: mining.
SUBSTANCE: system for moving derrick-drawworks unit of cluster drilling rig for drilling wells installed on derrick sub-structure includes substructures connected to derrick sub-structure and at least for jack supports connected to derrick substructure. Jack support of movement system includes supporting mat on the surface of which there are not less than two rails, hydraulic cylinder of horizontal movement and hydraulic cylinder of vertical movement with cylinder support, trolley with the possibility of supporting mat rotation round the vertical axis, rail clamps with cylindrical rollers connected to the trolley.
EFFECT: increase of drilling works efficiency within multiple-well platform, reduction of total construction time of multiple wells and multiple-well platform construction and preparation costs.
10 cl, 12 dwg
Title | Year | Author | Number |
---|---|---|---|
DERRICK-WINCH PULLEY OF DRILLING UNIT | 2011 |
|
RU2452844C1 |
DRILLING RIG OPERATION METHOD | 2014 |
|
RU2548270C1 |
DERRICK-AND-WINCH UNIT FOR DEEP WELL DRILLING RIG PREFERABLY USED FOR PRODUCTION WELL DRILLING | 2004 |
|
RU2281379C1 |
CLUSTER DRILLING PLANT | 2008 |
|
RU2378482C2 |
HOLE DRILLING RIG WITH IN-BUILT INTERNAL DEVICE TO LIFT AND LOWER AGGREGATE OF CRACK-ANDWORK BLOCK | 2016 |
|
RU2684653C2 |
DERRICK UNIT | 1992 |
|
RU2018622C1 |
MOBILE BLOCK-MODULE DRILLING RIG OF HIGH ERECTING CAPACITY AND LIFTING POWER OF 1600, 2000 AND 2250 kN | 2009 |
|
RU2420646C2 |
CLUSTER DRILLING RIG | 2019 |
|
RU2705132C1 |
PAD DRILLING UNIT | 2013 |
|
RU2525566C1 |
SLINGSHOT SUBSTRUCTURE FOR MOBILE DRILLING RIG | 2013 |
|
RU2603116C2 |
Authors
Dates
2012-08-20—Published
2011-02-09—Filed