FIELD: mining.
SUBSTANCE: method includes well drilling between the surface and roof of isolated underground working and construction of isolating barrier on the way of fire movement in the isolated underground working and pumping the isolating filling agent into the working. Note that the cavity is created along the whole width of working roof, for example, by blasting the explosive substance charges in the lower part of the well, the height of which is defined by proportion. Grinded rock is supplied from the surface to the rock crushed by explosion and rocky embankment is created on the ground of isolated underground working. Quick-hardening cement is supplied to the rocky embankment, note that the supply of quick-hardening cement is done at time intervals equal to the period of quick-hardening cement setting. The supply of quick-hardening cement is stopped at the height of isolating barrier satisfying the proportion.
EFFECT: increase of reliability of emergency area isolation at underground fires and reduction of material and labour costs.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ISOLATION OF EMERGENCY SECTION OF UNDERGROUND MINE WORKING | 2011 |
|
RU2462596C1 |
METHOD FOR ISOLATION OF EMERGENCY AREA OF UNDERGROUND WORKING | 2010 |
|
RU2459087C1 |
METHOD TO ISOLATE EMERGENCY SECTION OF UNDERGROUND MINE | 2011 |
|
RU2471075C1 |
PROCESS OF BREAKDOWN SITE ISOLATION | 2003 |
|
RU2328600C2 |
METHOD FOR ISOLATING AND EXTINGUISHING OF UNDERGROUND FIRES IN HARD-TO-REACH SITES OF MINE SHAFTS | 1997 |
|
RU2133830C1 |
PROCESSING METHOD OF INSULATION OF MINE WORKING AT THERMAL DEVELOPMENT OF OIL DEPOSITS | 2017 |
|
RU2687725C1 |
“BRIDGE-CEMENT CURTAIN” CONSOLIDATING ISOLATION SYSTEM CONSTRUCTION METHOD | 2018 |
|
RU2679212C1 |
MINE CONNECTORS CONSTRUCTION METHOD | 2017 |
|
RU2677186C1 |
METHOD OF UNDERGROUND FIRE CONTROL | 1998 |
|
RU2150006C1 |
TAMPING METHOD OF MARGINAL ROCKS MASSIF OF MINES BRIDGES | 2018 |
|
RU2677722C1 |
Authors
Dates
2012-08-20—Published
2010-11-25—Filed