FIELD: machine building.
SUBSTANCE: proposed system comprises foundation 12, hydroelectric turbine 10 to rest on said foundation 12, and afloat sea ship 14 that allows detachment of said foundation. Ship 1 allows detachment of foundation 12 and its lowering, and/or lifting to position right under the ship, and its attachment to ship. Foundation 12 comprises support 32 to pass upward through ship 14 when foundation 14 is attached to ship from below. Ship 14 has opening 30 for foundation 32 to pass through when foundation 12 is mounted under ship 14 to allow turbine 10 mounted on support 32 to pass there through.
EFFECT: simplified mounting.
13 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF HYDRO-ELECTRIC TURBINE SYSTEM TRANSPORTATION | 2012 |
|
RU2610746C2 |
SYSTEM AND METHOD FOR HYDRO-ELECTRIC TURBINE | 2011 |
|
RU2591970C2 |
METHOD OF TESTING OF HYDRO-ELECTRIC TURBINE | 2011 |
|
RU2581260C2 |
METHOD OF OPERATION OF HYDRO-ELECTRIC TURBINE SYSTEM | 2012 |
|
RU2641804C2 |
METHOD TO PERFORM UNDERWATER TECHNICAL WORKS DURING INSTALLATION OF BULK ITEMS AND DEVICE FOR ITS REALISATION | 2012 |
|
RU2495197C1 |
DEVICE FOR LOADING/UNLODING AND TRANSPORTATION OF HEAVY CARGO ON LIGHTER-VESSEL | 2001 |
|
RU2207288C2 |
VERTICAL INSTALLATION OF ELONGATED TECHNOLOGICAL ASSEMBLY | 2004 |
|
RU2353755C2 |
PROCESSING SYSTEM FOR SEA CLUSTER DRILLING | 2019 |
|
RU2731010C1 |
METHODS OF LOWERING AND LIFTING FOR SUBMERSIBLE VEHICLES AND OTHER PAYLOADS | 2012 |
|
RU2623293C2 |
SYSTEM FOR VESSEL MOORING AT SEA | 2006 |
|
RU2422318C2 |
Authors
Dates
2012-08-20—Published
2008-04-11—Filed