FIELD: transport.
SUBSTANCE: road 5 is cleaned for vehicles. Temporary weird 9 is arranged upstream of pond source to retain inflowing water. Then, water is drained from pond via flat gate of gatewell 3 or by siphon piping 10. As water level decreases and for uniform laying of ice 11 on silt 12 nearby bank, through saw cuts 13 are made on ice 11 by chainsaw depending on water depth. Note here that saw cut length equals 1 m and spacing between saw cuts varies from 5.0 to 10.0 m, distance ℓ from bank makes where H is water depth, δ is ice thickness, while α is bank slope. Water drained from pond, ice 11 is uniformly laid on slit 12. Then, slit 12 of sapropel is excavated. Cleaning is started from pond source top 8. Chainsaw is used to cut ice lumps. Mechanical shovel 14 loads slit on dump-truck to deliver on platform for it to be frozen-defrosted.
EFFECT: higher efficiency of cleaning.
2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PUMPED STORAGE PLANT (PSP) AND RIVERBED WATER WHEEL OF HYDRAULIC POWER UNIT | 2013 |
|
RU2529764C2 |
METHOD OF SAPROPEL PRODUCTION AND PLANT FOR ITS REALISATION | 2012 |
|
RU2494254C2 |
COMBINED UNIT FOR AFFORESTATION OF ABRUPT SODDED SLOPES OF RAVINES AND BEAMS | 2007 |
|
RU2389177C2 |
RUN-OF-RIVER PUMPING HYDRAULIC POWER PLANT | 2011 |
|
RU2453726C1 |
METHOD OF RESERVOIR WATER AREA LOCALIZATION OF POLLUTANTS ENTERING RESERVOIR FROM TRIBUTARIES AND DRAINS | 2017 |
|
RU2665072C1 |
PROCESS TO CLEAN BEADS OF SMALL RIVERS | 2002 |
|
RU2219305C1 |
RIVERBED ALL-SEASON HYDRAULIC POWER PLANT | 2010 |
|
RU2445507C2 |
METHOD FOR PLANT-FILLED LAKE CLEANING | 2005 |
|
RU2308564C2 |
SPORTING-PLEASURE SINGLE-SEATED VESSEL | 2013 |
|
RU2533849C1 |
ALL-SEASON MICRO RUN-OF-RIVER PLANT | 2015 |
|
RU2619969C1 |
Authors
Dates
2012-09-10—Published
2011-03-01—Filed