FIELD: oil and gas industry.
SUBSTANCE: well flow rate is changed in compliance with the method for determining the profile of fluid influx and parameters of borehole environment after continuous operation of the well with constant well flow rate during the time which is sufficient to provide minimum influence of production duration on speed of the next temperature change of the fluids supplied from productive formations to the well. Pressure on working face of the well is measured before and after the flow rate is measured. Temperature of influx of fluids supplied to the well is measured for each formation. Time versus fluid influx temperature graph and derivative versus influx temperature graph is built according to the logarithm of the time that passed after the flow rate change. As per the above derivative versus temperature graphs as per time logarithm there determined are the times when temperature derivative reaches constant value, and relative flow rates of formations are calculated as per mathematical expression. As per time versus fluid influx temperature graph there determined is fluid temperature change by this time, and skin factors of formations are calculated as per mathematical expression.
EFFECT: higher determination accuracy.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINATION OF FLUID-MOVEMENT PROFILE AND PARAMETERS OF NEAR-WELLBORE | 2010 |
|
RU2455482C2 |
METHOD FOR DETERMINATION OF INFLUX PROFILE AND BOREHOLE ENVIRONMENT PARAMETERS IN MULTILAY WELL | 2009 |
|
RU2505672C1 |
METHOD FOR MONITORING THE ORIGIN OF THE EXTRACTED BOREHOLE FLUID | 2021 |
|
RU2778869C1 |
METHOD OF DETERMINING FLUID MOVEMENT PROFILE OF STACKED POOLS IN WELL | 2013 |
|
RU2531499C1 |
METHOD FOR ASSIGNING INJECTION AND PRODUCTION WELLS AND CHANGING THEIR PERFORATION INTERVALS | 2017 |
|
RU2658422C1 |
METHOD OF EVALUATION OF PARAMETERS OF FRACTURES OF FORMATION HYDRAULIC FRACTURING FOR HORIZONTAL WELL | 2020 |
|
RU2741888C1 |
METHOD FOR DETERMINING PROFILE OF FLUID INFLUX OF MULTIFORMATION DEPOSITS | 2011 |
|
RU2474687C1 |
DETERMINING METHOD FOR PARAMETERS OF FORMATION NEAR ZONE | 2017 |
|
RU2651647C1 |
METHOD FOR DETERMINATION OF PARAMETERS FOR WELL BOTTOMHOLE AND BOTTOMHOLE AREA | 2012 |
|
RU2535324C2 |
METHOD FOR DETERMINING PROFILE OF FLUID INFLUX IN MULTI-PAY WELL | 2016 |
|
RU2645692C1 |
Authors
Dates
2012-09-10—Published
2010-09-30—Filed