FIELD: mining.
SUBSTANCE: method involves emulsions preparation in mix-pump truck, addition of gas-generating agent to emulsion, well charging with emulsion explosive. Emulsion agent is sensibilised to density not exceeding critical density in bottom part of charge. Things considered are: height of charge column, height of water stemming, change in emulsion temperature and solubility of evolved gas in emulsion. Maximum possible density of charge of gas-generated emulsion agent is calculated by the formula.
EFFECT: increasing work efficiency, improving safety, enlarging manufacturing capabilities.
Title | Year | Author | Number |
---|---|---|---|
METHOD TO CHARGE DEEP DRY WELLS WITH EMULSION EXPLOSIVE SUBSTANCE SENSIBILISED BY METHOD OF GAS GENERATION | 2009 |
|
RU2410639C1 |
METHOD FOR FORMING COUNTER CHARGES OF EMULSION EXPLOSIVE SUBSTANCES | 1990 |
|
RU2061864C1 |
METHOD FOR CHARGING OF DEEP HOLES | 2002 |
|
RU2232371C2 |
METHOD OF RUNNING OF THE BLASTING OPERATIONS IN THE FLOODED WELL USING THE CHARGE OF THE EMULSION BLASTING EXPLOSIVE | 2006 |
|
RU2305673C1 |
METHOD OF MAKING EMULSION EXPLOSIVE MATERIAL AND EMULSION EXPLOSIVE MATERIAL MADE USING SAID METHOD | 2009 |
|
RU2388735C1 |
METHOD FOR FORMING CONTOUR CHARGES FROM EMULSION EXPLOSIVES | 2018 |
|
RU2672078C1 |
WATER-RESISTANT EMULSION EXPLOSIVE AND EMULSION COMPOSITION FOR WATER-RESISTANT EXPLOSIVES | 2013 |
|
RU2544680C1 |
METHOD TO PRODUCE EMULSION EXPLOSIVE AND CHARGING OF BLAST HOLES, MIXING-CHARGING MACHINE FOR METHOD REALISATION | 2012 |
|
RU2498209C1 |
METHOD FOR LOADING INCLINED WELLS | 2006 |
|
RU2305823C1 |
MIXING-CHARGING SYSTEM | 2018 |
|
RU2723791C1 |
Authors
Dates
2012-09-27—Published
2011-03-25—Filed