FIELD: construction.
SUBSTANCE: method to connect guncrete pillars at height and slabs is realised via a connecting cartridge. At 1/2 height of the connecting cartridge with diametral arrangement in plan "П"-shaped slots are arranged with their subsequent bending inside at the angle α=90°. A cylindrical belt is installed in the plane of bends arrangement.
EFFECT: manufacturability of guncrete pillars coupling and provision of conditions for joint operation of a concrete core, a metal shell and slab elements.
3 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO BUILD-UP PIPE-CONCRETE COLUMNS AND TO JOIN THEM WITH SLABS | 2012 |
|
RU2503782C2 |
METHOD OF CONSTRUCTING A CONICAL HEAD FOR TUBULAR CONCRETE COLUMNS WITH CIRCULAR CROSS-SECTION | 2020 |
|
RU2747999C1 |
METHOD TO INCREASE BEARING CAPACITY OF CONCRETE-PIPE STRUCTURES | 2009 |
|
RU2420636C1 |
METHOD FOR ERECTION OF BEARING PIPE-AND-CONCRETE STRUCTURES FROM MONOLITHIC CONCRETE IN ERECTION OF BUILDINGS | 2009 |
|
RU2402662C1 |
UNIT FOR JOINTING PIPE-CONCRETE COLUMNS WITH TIE BEAMS | 2018 |
|
RU2691249C1 |
METHOD TO INCREASE BEARING CAPACITY OF CONCRETE-PIPE STRUCTURES | 2010 |
|
RU2417290C1 |
JUNCTIONAL COUPLING OF PILLAR WITH SOLID SLAB | 2013 |
|
RU2564720C2 |
UNIT FOR INTERFACING PIPE CONCRETE PILLARS-COLUMNS WITH SUPPORT BEAMS (EMBODIMENTS) | 2019 |
|
RU2716751C1 |
DEVICE FOR STRENGTHENING A FLAT MONOLITHIC REINFORCED CONCRETE FLOOR SLAB | 2021 |
|
RU2760653C1 |
TUBULAR BUILDING CONSTRUCTION | 2007 |
|
RU2342501C1 |
Authors
Dates
2012-10-20—Published
2011-03-21—Filed