FIELD: construction.
SUBSTANCE: method for road construction includes separation of a section intended for road construction into serially arranged construction sites, delivery of loose material to a construction site with technological transport. The road surface is formed in the following manner: loose material is packed into strong material, forming a continuous tape of specified length, layers of road surface are formed by laying the tape in rows along or across the construction site.
EFFECT: construction time is reduced, efficiency increases, and more durable road surface is provided.
7 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTING ROAD EMBANKMENT | 2016 |
|
RU2636664C1 |
METHOD FOR ROAD BUILDING ACROSS PEATBOG (VARIANTS) | 2005 |
|
RU2293814C1 |
PROCESS OF ERECTION OF ROADBED | 2002 |
|
RU2224837C2 |
METHOD FOR CONSTRUCTION OF GROUP PILE FOUNDATION FOR BORING AND OPERATION OF WELLS IN OIL AND GAS DEPOSITS | 2007 |
|
RU2353727C1 |
CORDUROYING MATERIAL FOR CONSTRUCTION OF ROADS | 2018 |
|
RU2735404C2 |
ROAD | 2016 |
|
RU2636663C1 |
ROADBED AND ROADBED FORMING METHOD | 2005 |
|
RU2273687C1 |
EARTHFILL FOR ARRANGEMENT OF TECHNOLOGICAL ROAD ON WEAK FOUNDATION | 2008 |
|
RU2379423C2 |
UNSTABLE GROUND THERMOSTRUCTURAL FOUNDATION | 2003 |
|
RU2345191C2 |
IMPROVED ROAD-BUILDING SOIL | 2013 |
|
RU2541009C2 |
Authors
Dates
2012-10-27—Published
2011-05-03—Filed