FIELD: process engineering.
SUBSTANCE: proposed installation comprises, at least, two reactors equipped with, at least, one bypass tube connected with union of discharge from the first or previous reactor to second or next reactor from internal: wall cavity or tank secured to down-take pipe. Note here that internal wall cavity or tank is used as intermediate collector for heat-control additional feed of mix of volume equal to that of mix maximum portion added simultaneously into second and next reactor for heat control. Besides, every bypass tube incorporates flow rate control valve.
EFFECT: higher safety, reduced metal input.
4 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR MULTISTAGE CYCLOHEXANE OXIDATION | 2008 |
|
RU2383523C2 |
BARBOTAGE REACTOR OF CASCADE OXIDATION | 2006 |
|
RU2334552C1 |
BUBBLER REACTOR OF CYCLOHEXANE OXIDATION | 2008 |
|
RU2381060C2 |
REACTOR OF MULTISTAGE OXIDATION | 2007 |
|
RU2339441C1 |
BUBBLING CYCLOHEXANE OXIDATION REACTOR | 2011 |
|
RU2469786C1 |
BUBBLE REACTOR OF CYCLOHEXANE OXIDATION | 2010 |
|
RU2448767C1 |
REACTOR FOR CASCADE OXIDIZING | 2005 |
|
RU2287362C1 |
CYCLOHEXANE CASCADE OXIDATION BUBLING REACTOR TOP SECTION | 2006 |
|
RU2337748C2 |
REACTOR | 2006 |
|
RU2323773C2 |
INSTALLATION FOR PREPARING AMMONIUM SULPHATE SOLUTION THROUGH DIRECT MIXTURE OF SULPHURIC ACID AND AMMONIA | 2008 |
|
RU2393993C2 |
Authors
Dates
2012-12-10—Published
2011-08-24—Filed