FIELD: oil and gas industry.
SUBSTANCE: isolation method of brine water influx in the well flooded with brine water cone, at which isolating cement bridge from hydrophobisating cement compound is installed after removal of tubing string from well at perforation of non-flooded part of productive formation. After waiting on cement period is completed, it is drilled so that cement ring remains on walls of production string, which covers the perforation interval of non-flooded part of productive formation. To interval of flooded part of productive formation there pumped under pressure through lower perforation holes is water isolating composition, for example plasticised cement grouting or gel with increased flowability and permeability so that make-up cement bridge from cement solution on the basis of cement of normal density remains in well shaft, which covers lower perforation holes made in flooded part of productive formation. After wait-on-cement time (WOC) is over and strength and leakage test of cement bridge is completed, repeated perforation of the perforation interval of non-flooded part of productive formation covered with cement ring is performed in the most effective gas-saturated part of the section. Methanol is pumped through newly formed perforation holes to remove aqueous component of filtrate of hydrophobisating cement compound; then, acid treatment of newly opened perforation interval is performed to destruct cement ring, tubing string is lowered to the well to the depth of upper holes of new perforation interval and the well is developed.
EFFECT: increasing brine water influx isolation efficiency.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
ISOLATION METHOD OF BRINE WATER INFLUX IN WELL | 2012 |
|
RU2488692C1 |
ISOLATION METHOD OF BRINE WATER INFLUX IN WELL | 2011 |
|
RU2468186C1 |
ISOLATION METHOD OF BRINE WATER INFLUX IN WELL | 2011 |
|
RU2471061C1 |
METHOD FOR ISOLATION OF RESERVOIR WATER INFLOW IN WELL WITH BUCKLED FLOW STRING UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES | 2009 |
|
RU2405931C1 |
METHOD OF PRODUCTIVE RESERVOIR OPENING | 2018 |
|
RU2723813C2 |
ISOLATION METHOD OF BRINE WATER INFLUX IN WELL | 2014 |
|
RU2580532C2 |
RECOVERY METHOD OF WATER-PRODUCING OIL-AND-GAS WELL IN CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 2009 |
|
RU2410529C1 |
METHOD OF WATER-PRODUCING WELL RECOVERY | 2014 |
|
RU2543005C1 |
METHOD FOR ISOLATION OF RESERVOIR WATER INFLOW IN WELL WITH BUCKLED FLOW STRING UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES | 2009 |
|
RU2405930C1 |
BOTTOM WATER ISOLATION METHOD | 2013 |
|
RU2569941C2 |
Authors
Dates
2012-12-27—Published
2011-06-29—Filed