FIELD: oil and gas industry.
SUBSTANCE: method involves drilling at least of one well with its intersecting the formation layers and alternating series cyclic loading to the formation through the well of portions of foaming solution of surface active substance and gas. According to the invention, total volume of foaming solution of surface active substance is determined based on penetration of foaming solution of surface active substance to more low-permeable layer through the distance corresponding to ten radii of the well. Number of portions of gas and foaming solution of surface active substance corresponds to the number of formation layers, and number of pumped gas under formation conditions in each portion exceeds by four times the volume of portion of foaming solution of surface active substance. When cyclic pumping process of portions of foaming solution of surface active substance and gas is completed, continuous gas pumping to the well is continued.
EFFECT: increasing the efficiency of the method owing to providing the possibility of liquid displacement with gas with more complete involvement in the displacement process of low-permeable formation layers.
2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CREATING UNDERGROUND GAS STORAGE IN WATER-BEARING GEOLOGIC STRUCTURE | 2015 |
|
RU2588500C1 |
METHOD FOR EXTRACTING OIL DEPOSITS | 2002 |
|
RU2236569C2 |
METHOD FOR MAKING LOW-PERMEABILITY CURVED SCREEN IN POROUS MEDIUM AT UNDERGROUND GAS STORAGE | 2016 |
|
RU2645053C2 |
METHOD FOR CREATION OF UNDERGROUND GAS STORAGE IN WATER-BEARING GEOLOGICAL STRUCTURE | 2017 |
|
RU2697798C2 |
METHOD OF LOW PERMEABLE SCREEN CREATION IN POROUS MEDIA OF UNDERGROUND GAS STORAGE | 2008 |
|
RU2375281C1 |
METHOD FOR MAKING LOW-PERMEABILITY SCREEN IN POROUS MEDIUM AT UNDERGROUND GAS STORAGE | 2011 |
|
RU2483012C1 |
CREATION METHOD OF LOW-PREMEABILITY OF SCREEN IN POROUS MEDIUM | 2009 |
|
RU2386805C1 |
METHOD FOR CREATING AND OPERATING AN UNDERGROUND GAS STORAGE FACILITY IN AN AQUIFEROUS GEOLOGICAL STRUCTURE | 2021 |
|
RU2770028C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF WELL | 1996 |
|
RU2103494C1 |
METHOD OF DEVELOPMENT OF OIL POOL | 1999 |
|
RU2142557C1 |
Authors
Dates
2013-01-10—Published
2011-09-14—Filed