FIELD: construction.
SUBSTANCE: method for construction of a foundation in winter time includes formwork and a mixture. In the hollow space between formworks a dry mixture of siftings and cement is filled, where perforated tubes are pre-inserted, being connected via a hole from the other end to the steam boiler equipped with a valve to monitor and to maintain pressure. Water vapour is supplied until full moistening of the dry mixture of siftings and cement, afterwards perforated tubes are withdraw and moved to the next section of the laid foundation.
EFFECT: improved quality of a foundation and decreased power inputs for performance of works in winter time.
2 cl, 3 dwg
Authors
Dates
2013-01-27—Published
2011-10-12—Filed