FIELD: oil and gas industry.
SUBSTANCE: method involves construction of horizontal production wells enclosing the deposit and injection wells, injection of displacement agent through injection wells and product extraction with production wells. According to the invention, horizontal production wells are arranged in parallel; at that, in horizontal sections, uprising branches to the formation roof are subsequently drilled to opposite sides in more permeable sections. Rows of vertical wells are located between horizontal sections with the distance between the wells in the rows, which exceeds the distance to horizontal section of the nearby horizontal production well by 1.2-1.4 times. Besides, one vertical well in each row is an injection one, and the rest are production ones. As vertical production wells are being watered out up to 90%, they are changed over to injection ones.
EFFECT: increasing oil extraction; enlarging the application of horizontal wells with uprising branches under various deposit development conditions.
1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF OIL DEPOSIT WITH HORIZONTAL WELLS | 2011 |
|
RU2474678C1 |
METHOD OF OIL FIELD DEVELOPMENT WITH HORIZONTAL WELLS | 2014 |
|
RU2550642C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT IN CARBONATE RESERVOIRS | 2015 |
|
RU2597305C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2011 |
|
RU2439299C1 |
DEVELOPMENT OF FRACTURED RESERVOIRS | 2013 |
|
RU2526037C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT WITH LOW THICKNESS | 2010 |
|
RU2438010C1 |
PROCESSING OF FRACTURED RESERVOIR | 2013 |
|
RU2526082C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT COMPLICATED WITH VERTICAL RUPTURE | 2010 |
|
RU2431740C1 |
METHOD OF DEVELOPING MULTI-BED MASSIVE OIL DEPOSIT | 2011 |
|
RU2464414C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2513962C1 |
Authors
Dates
2013-02-10—Published
2011-10-03—Filed