FIELD: mining.
SUBSTANCE: method includes use of control devices. At the same time a control device is installed in a blind pit neck in the form of a metal triangular pyramid with gates of louvre type with flow-guiding sections added along with development of the blind pit, which may redistribute and send at any moment of time the required portion of general mine ventilation air for ventilation of the blind pit without installation of an additional source of draught. At the same time gates are moved with a controlled pneumatic drive in a horizontal plane.
EFFECT: higher efficiency of ventilation of underground blind pits.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF VENTING OF BLIND WORKING | 2016 |
|
RU2631946C1 |
METHOD FOR DUST AND GAS REMOVAL FROM STOPE ORE | 2010 |
|
RU2453702C1 |
METHOD OF VENTILATING BLIND WORKING | 2016 |
|
RU2648788C1 |
METHOD FOR REMOVAL OF DUST AND GAS FROM BREAKAGE HEADING IN CASE OF ROOM-AND-PILLAR DEVELOPMENT SYSTEM | 2009 |
|
RU2392440C1 |
DEVICE FOR INJECTION AIRING OF BOTTOMHOLES OF BLIND DRIFT | 2009 |
|
RU2414599C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
VENTING OF EXTRACTION BLOCK AT INVERSE WORKING OF ON-DIP MINERAL | 2014 |
|
RU2569647C1 |
METHOD TO DETERMINE METHANE RISK OF DEVELOPING ENTRY | 2012 |
|
RU2515459C1 |
METHOD FOR PANEL VENTILATION IN PANEL-BLOCK PREPARATION SYSTEM | 2009 |
|
RU2400632C1 |
METHOD FOR VENTILATION OF BLIND WORKINGS | 0 |
|
SU1687795A1 |
Authors
Dates
2013-04-10—Published
2011-08-19—Filed