FIELD: mining.
SUBSTANCE: method includes erection of vertical rising wells onto a drained water-bearing horizon, besides, from each rising well in a point located by 30-50 m below the water-bearing horizon soil, an additional side shaft is cut with a rounding (curve) radius of around 50 m. The side shaft is tunnelled after it reaches drained rocks in direction of the next rising well to the point of exit of the next additional shaft into drained rocks. It makes it possible to create a closed drainage contour and to practically eliminate ingress of underground waters into a protected mine or pit.
EFFECT: reduced ingress of underground waters to minimum permissible values.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
DRAINAGE METHOD OF OPEN PIT EDGES BY MEANS OF SYSTEMS OF COMBINED DRAINAGE DEVICES | 2010 |
|
RU2465405C2 |
METHOD OF WELL HYDROMINING AT EXCAVATION WITH PRELIMINARY DRYING OF MINERALS | 2011 |
|
RU2499140C2 |
TECHNOLOGY TO STABILISE SLIDE SLOPES WITH STREAMLINED DEWATERING WELLS | 2010 |
|
RU2421573C1 |
PROTECTION METHOD OF OPEN PIT AGAINST UNDERGROUND WATER INFLUX | 2012 |
|
RU2531913C2 |
BUILDING METHOD OF WATERTIGHT SCREEN IN BUILT-UP AREAS | 2007 |
|
RU2349710C1 |
PREVENTION METHOD OF LIQUID CONTAMINATIONS FRONTAL ADVANCE IN FORMATION MASSIF | 2007 |
|
RU2365703C1 |
METHOD FOR WATER RESOURCE PROTECTION BY MEANS OF HORIZONTAL (INTERFORMATION) CUTOFFS AND CUTOFF ERECTION TECHNIQUE | 2007 |
|
RU2347034C1 |
METHOD FOR RECONSTRUCTION OF A FLOODED MINE MINED BY OPEN-UNDERGROUND METHOD | 2023 |
|
RU2798370C1 |
METHOD AND DEVICE FOR ERECTION OF HORIZONTAL DRAIN HOLE IN WATERED SANDS | 2008 |
|
RU2382866C2 |
METHOD OF HORIZONTAL RADIAL DRAIN HOLE CONSTRUCTING IN HARD ROCKS | 2007 |
|
RU2337244C1 |
Authors
Dates
2013-04-10—Published
2011-11-24—Filed