FIELD: electrical engineering.
SUBSTANCE: method is based on simultaneous measurement of voltages of the mains three part relative to the earth within the distribution gear bus section and of the three phases currents at the beginning of each line branching off the bus section. The measurements are preformed in the regular mode of the mains operation and immediately after creation of artificial asymmetry of phase voltages relative to the earth by way of transient connection of an additional conductance to the earth to one of the phases in the bus section. Relying on the measurements results, one calculates the degree of voltage fluctuation due to the asymmetry creation and increment of average power value thereby occurring (for each line being controlled). Then one calculates resistance of insulation of the phases being controlled with the load connected with the results transmitted to the data concentrator for the electric mains insulation diagnostics and condition forecast to be carried out relying thereon.
EFFECT: ensuring the possibility of operational control over insulation condition, diagnostics and forecast of condition of a group of objects within the electric mains.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PROTECTING A THREE-PHASED NETWORK FROM ONE-PHASED GROUND FAULT | 2006 |
|
RU2309507C1 |
TOTAL SECTIONALISING PROTECTION DEVICE FOR THREE-PHASE NETWORK FROM SINGLE PHASE-TO-GROUND FAULTS | 2013 |
|
RU2538767C1 |
CURRENT PROTECTION METHOD OF THREE-PHASE NETWORK FROM SINGLE PHASE-TO-GROUND FAULTS | 2013 |
|
RU2527075C1 |
DEVICE FOR RESONANCE TUNING OF COMPENSATION OF EARTHING CURRENT | 0 |
|
SU920954A1 |
METHOD OF PROTECTION FROM SINGLE-PHASE EARTH FAULT FOR TRIPLE-PHASE NETWORK WITH RESISTANCE EARTHING NEUTRAL AND DEVICE FOR METHOD IMPLEMENTATION | 2008 |
|
RU2352044C1 |
METHOD FOR CONTROLLING CONDUCTIVITY OF ISOLATION RELATIVELY TO GROUND OF GRID PORTION WITH ISOLATED NEUTRAL LINE | 2003 |
|
RU2242015C1 |
CURRENT-LIMITING DEVICE | 1994 |
|
RU2115206C1 |
METHOD OF DETERMINING OVERHEAD ELECTRIC POWER LINE TOWER WITH SINGLE-PHASE EARTHING AND EARTHING FAULT | 2009 |
|
RU2394249C1 |
ELECTRICAL NETWORK NEUTRAL GROUNDING CONTROL METHOD | 2022 |
|
RU2788678C1 |
APPARATUS FOR MEASURING VALUE OF EARTH SHORTING CURRENT | 0 |
|
SU1208519A1 |
Authors
Dates
2013-04-10—Published
2011-11-23—Filed