FIELD: construction.
SUBSTANCE: water-intake tubular well comprises a perforated pipe in soil. The pipe is installed with perforation at the section of a water-bearing horizon and is connected with an upper end with a suction channel of a vacuum pump. The vacuum pump is a water-ring pump, and its injection channel is connected with an injection pipeline. The pipeline comprises a vertical section and is aligned into a reservoir to collect water lifted from the well. The water-lifting pipe of the water-intake tubular well is equipped with a central tube reaching into atmosphere and with a lower perforated end lowered into water in the well. Perforation is arranged along the tube generatrix with increased diameter of holes in the top-down direction. The perforated section of the water-supply tube is located approximately at the static level of water in the well.
EFFECT: increased height of water lifting from a water-intake well by means of vacuumising.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
WATER LIFTING METHOD, AND DEVICE FOR ITS IMPLEMENTATION | 2011 |
|
RU2459981C1 |
WATER-INTAKE TUBULAR WELL AND DEVICE FOR ITS ERECTION | 2011 |
|
RU2472901C1 |
DEVICE TO ERECT WATER-INTAKE TUBULAR WELL | 2011 |
|
RU2468156C1 |
METHOD OF WATER SUPPLY AND DEVICE FOR ITS REALISATION | 2012 |
|
RU2513639C2 |
WATER SUPPLY WELL WITH UNDERGROUND WATER INTAKE | 2012 |
|
RU2499869C1 |
METHOD TO BUILD WELL TO PRODUCE WATER FROM SOIL WATER-BEARING BED | 2014 |
|
RU2548881C1 |
METHOD TO ERECT HORIZONTAL UNDERGROUND WATER INTAKE OF COMBINED DESIGN | 2012 |
|
RU2528836C2 |
HORIZONTAL UNDERGROUND WATER INTAKE OF COMBINED DESIGN | 2012 |
|
RU2518452C2 |
UNDERGROUND HORIZONTAL WATER INTAKE OF COMBINED DESIGN | 2012 |
|
RU2513183C2 |
METHOD OF ERECTION OF UNDERGROUND HORIZONTAL WATER INTAKE OF COMBINED STRUCTURE | 2012 |
|
RU2512031C2 |
Authors
Dates
2013-04-20—Published
2011-06-29—Filed