FIELD: oil and gas industry.
SUBSTANCE: method involves perforation of a production string below the level of current water-gas contact; lowering to the well of an additional tubing string of small diameter with layout of bottomhole equipment lowered below the operating serving for separation of inner space of the production string, which is filled with gas and water, a working chamber intended for accumulation of liquid condensing in the working face; supply of high-pressure gas to the mall-diameter tubing string from a compressor installed on day surface or a donor well with wellhead pressure above hydrostatic pressure at absolute hypsometric level corresponding to location of process holes of the receiving well more than by 10 atm; gas flushing of excess pressure, liquid condensed in the working face and accumulated in the working chamber to water-saturated interval located below the operating productive interval; as well as installation on day surface of a separator for gas drying, pressure gauges for monitoring of wellhead pressure of the main and minor tubing string, shutoff and control devices for control of gas flow along the main and minor tubing string, a control unit performing the monitoring and control of the process according to the specified algorithm.
EFFECT: increasing efficiency of inventions.
4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF UNINTERRUPTED OPERATION OF GAS AND GAS CONDENSATE WELLS, PROVIDING REMOVAL OF ACCUMULATED BOTTOMHOLE FLUID | 2019 |
|
RU2722897C1 |
METHOD FOR REMOVING CONDENSATE OR WELL KILLING FLUID FROM A PLUGGED GAS WELL, A METHOD FOR OPERATING A GAS WELL AND PREVENTING ITS “SELF-PLUGGING” AND A DOWNHOLE DEVICE FOR THEIR IMPLEMENTATION | 2022 |
|
RU2789535C1 |
METHOD FOR DRYING WATER-FLOODED GAS WELLS AND DEVICE FOR ITS IMPLEMENTATION | 2024 |
|
RU2823338C1 |
PROCEDURE FOR COMPLETION AND OPERATION OF WELL | 2009 |
|
RU2394978C1 |
METHOD AND DEVICE FOR REMOVING LIQUID FROM GAS-CONDENSATE WELL | 1996 |
|
RU2114284C1 |
PROCEDURE FOR SIMULTANEOUS OPERATION OF SEVERAL OBJECTS IN PRODUCER AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2438008C1 |
METHOD FOR RECOVERING GAS FROM FLOODED FORMATION | 0 |
|
SU1006726A1 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF SEVERAL PAYOUT BEDS AND INSTALLATION OF WELL FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2334867C1 |
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
PROCEDURE FOR INSULATING PERMEABLE SECTION OF PRODUCTION STRING OR PERFORATED INTERVAL OF IDLE FORMATION OF WELL (VERSIONS) | 2008 |
|
RU2383713C1 |
Authors
Dates
2013-06-10—Published
2012-07-18—Filed