FIELD: oil and gas production.
SUBSTANCE: proposed pump unit comprises tube string, parker, string separator, cable, downhole motor, rod string, bypass, check and drain valve, and two separate bed product transfer pumps. Note here that bottom bed product transfer downhole pump is encased while top bed product transfer pump represents a rod-type pump. Bypass valves are arranged above and below perforation intervals in operation string. Separator, tight case accommodating downhole motor and electrically driven rotary pump furnished with cable seal and bypass are arranged above the parker. Separator, check and drain valves and eccentric bush are arranged above said tight case. Said eccentric bush is connected via branch pipe with blind adapter, bypass valve above which rod pump is arranged. Product mixer is arranged above rod pump. Note here that eccentric bush and mixer are communicated via bypass line.
EFFECT: separate transfer of beds product and gas bypass from under-parker space.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTIPLE-ZONE WELL BY TWO SUBMERSIBLE PUMPS AND EQUIPMENT FOR ITS IMPLEMENTATION | 2012 |
|
RU2515630C1 |
PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS IN WELL WITH INCREASED GAS FACTOR | 2024 |
|
RU2825381C1 |
WELL PUMPING UNIT FOR SIMULTANEOUS SEPARATE DEVELOPMENT OF TWO RESERVOIRS IN WELL | 2010 |
|
RU2427705C1 |
INSTALLATION FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO LAYERS OF ONE WELL | 2016 |
|
RU2618713C2 |
METHOD OF DUAL OIL PRODUCTION FROM LAYERS OF ONE WELL WITH SUBMERSIBLE PUMP SET (VERSIONS) | 2007 |
|
RU2344274C1 |
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS | 2014 |
|
RU2552555C1 |
PUMP UNIT FOR SIMULTANEOUS SEPARATE OPERATION OF TWO FORMATIONS | 2019 |
|
RU2722174C1 |
INSTALLATION FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO LAYERS OF ONE WELL | 2016 |
|
RU2618710C2 |
PUMP UNIT FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO WELL FORMATIONS | 2018 |
|
RU2699502C1 |
INSTALLATION FOR SIMULTANEOUS-SEPARATE OPERATION OF TWO BEDS OF ONE WELL | 2016 |
|
RU2617733C2 |
Authors
Dates
2012-10-20—Published
2011-04-22—Filed