FIELD: oil and gas industry.
SUBSTANCE: method involves hydraulic fracturing of a separate broken manifold layer of underground formation in order to provide heterogeneous arrangement of a propping agent, at which columns of propping agent are arranged so that they are not spread throughout the fracture height (for vertical fracture), but are interrupted with channels between columns forming tracks leading to the well shaft. The method combines methods of introduction of plugs of the liquid carrying the propping agent, and liquid without any propping agent through multiple clusters of perforations in a single broken layer of the rock with the methods preventing merging of plugs leaving separate clusters.
EFFECT: improving the efficiency of hydraulic fracturing.
43 cl, 12 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR FISSURE CREATION IN UNCASED WELLS | 2002 |
|
RU2318116C2 |
HETEROGENEOUS PROPPANT PLACEMENT IN FRACTURE WITH REMOVABLE EXTRAMETRICAL MATERIAL FILL | 2012 |
|
RU2603990C2 |
INHOMOGENEOUS DISTRIBUTION OF PROPPANT WITH REMOVABLE EXTRA-METRIC FILLER MATERIAL IN FORMATION HYDRAULIC FRACTURING | 2012 |
|
RU2608372C2 |
METHOD OF PACKING SOLID MATERIALS DURING UNDERGROUND TREATMENT OPERATIONS | 2014 |
|
RU2679934C1 |
METHODS OF MINIMIZING EXCESSIVE EXTENSION OF PROPPING AGENT UNDER HYDRAULIC FRACTURING TREATMENT | 2014 |
|
RU2666566C2 |
PRELIMINARY ANALYSIS OF DRILLING SITE FOR PLANNING OF DEPOSITE MINING | 2008 |
|
RU2489571C2 |
METHOD OF HYDRAULIC BREAKDOWN OF FORMATION | 2010 |
|
RU2523316C1 |
DIRECT CHANNELING METHOD AND SYSTEM FOR INCREASING FRACTURE CONDUCTIVITY | 2014 |
|
RU2638667C2 |
METHOD OF HYDRAULIC FRACTURE CRACK POSITION IDENTIFICATION IN WELL (EMBODIMENTS) | 2016 |
|
RU2723778C1 |
METHOD FOR TREATMENT OF WELL WITH REMOVAL BY MEANS OF MATERIAL CAPABLE OF DECOMPOSING | 2012 |
|
RU2640618C2 |
Authors
Dates
2013-06-10—Published
2007-07-03—Filed