METHOD AND DEVICE FOR FISSURE CREATION IN UNCASED WELLS Russian patent published in 2008 - IPC E21B43/26 

Abstract RU 2318116 C2

FIELD: mining, particularly hydraulic underground seam fracturing, namely methods and devices to create fissures in uncased horizontal or vertical well.

SUBSTANCE: device comprises a number of units having rupture discs. Each disc is characterized by independent fracturing pressure, i.e. the first unit has lesser fracturing pressure in comparison with the second unit and corresponds to predetermined interval to be treated. The units are arranged in work string or well completion pipe string so that unit having lesser fracturing pressure is located at front end thereof or in the lowermost area. Next units have fracturing pressures increasing in direction from front pipe string end. As liquid is injected via pipe string pressure is increased to value exceeding fracturing pressure of the first rupture disc to provide processing liquid contact with seam. After the first horizon treatment or fracturing said horizon may be isolated. After that pressure may be repeatedly increased in pipe string and other discs may be ruptured.

EFFECT: increased efficiency due to possibility of continuous several seam fracturing.

13 cl, 6 dwg

Similar patents RU2318116C2

Title Year Author Number
METHOD FOR FRACTURING AND PROPPING OF FISSURES IN SUBSURFACE BED 1995
  • Llojd Garner Dzhons
RU2138632C1
METHOD OF BOREHOLE CONDITIONING WITH COLLECTION OF PRODUCTIVE INTERVALS 2007
  • Ist Lojd Eh. Ml.
  • Kurvill' Perri Uehjn
  • Altman Richard A.
  • Klehjton Robert
RU2395667C1
METHOD OF HETEROGENEOUS ARRANGEMENT OF PROPPING AGENT IN FRACTURE OF HYDRAULIC FRACTURING OF BROKEN FORMATION 2007
  • Kosarev Ivan Vital'Evich
  • Medvedev Oleg Olegovich
  • Medvedev Anatolij Vladimirovich
  • Walton Ian
RU2484243C2
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman, Randy, C.
  • Morrow, Timothy, I
  • Benish, Timothy, G.
RU2658400C1
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION 2015
  • Tolman Rendi K.
  • Morrou Timoti I.
  • Benish Timoti G.
RU2664989C1
FORMATION HYDRAULIC FRACTURING METHOD (OPTIONS) AND COUPLING FOR ITS IMPLEMENTATION 2021
RU2765186C1
COMPLETION ASSEMBLY AND METHOD FOR WELL COMPLETION IN UNDERGROUND FORMATION 2008
  • Surdzhaatmadzha Dzhim B.
  • Khauehll Mehtt'Ju T.
RU2431036C2
FORMATION IN THE WELL INTERVAL BY INTERVAL MULTI-STAGE HYDRAULIC FRACTURING PERFORMANCE METHOD AND A DEVICE FOR ITS IMPLEMENTATION 2018
  • Korabelnikov Mikhail Ivanovich
  • Korabelnikov Aleksandr Mikhajlovich
RU2682391C1
METHOD AND DEVICE FOR REMOTE INTERVENTION BY MEANS OF LOGIC VALVE CONTROL 2003
  • Lonns Stiven B.
  • Sorem Uill'Jam A.
RU2358090C2
PROCEDURE FOR COMPLETION WITH HYDRO-FRAC IN MULTITUDE OF PRODUCING INTERVALS (VERSIONS) 2008
  • Ist Lojd Eh. Ml.
RU2412347C1

RU 2 318 116 C2

Authors

Veng Ksiaovej

Braun Dzh. Ehrnest

Boni Kertis L.

Dates

2008-02-27Published

2002-12-23Filed