FIELD: oil and gas industry.
SUBSTANCE: method for reinforcement of a bottom-hole zone and prevention of sand carry-over from a well involves pumping to the well of polyurethane pre-polymer. Before polyurethane pre-polymer is pumped to the well, isopropyl alcohol is pumped, and after pre-polymer is pumped, buffer marketable Devonian oil is pumped and forced-through with water with density of 1000-1200 kg/m3. At that, forcing-through is performed at maximum allowable speed for formation of a polymer film fixing sand grains of the bottom-hole zone.
EFFECT: invention allows increasing the time of absence of polyurethane pre-polymer contact with water, which allows providing the required treatment radius of the formation bottom-hole zone, increasing sand fixing ability of the compound at maintaining permeability and productivity of the oil formation.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BINDING BOTTOMHOLE ZONE OF FORMATION | 2007 |
|
RU2352764C2 |
METHOD OF REINFORCING BOTTOMHOLE FORMATION AND ISOLATION OF BRINE WATER INFLUX IN OIL AND GAS WELLS | 2014 |
|
RU2587670C2 |
HYDROCARBON PRODUCTION INTENSIFICATION METHOD BY LIMITATION OF SAND PRODUCTION IN OIL AND GAS WELLS | 2014 |
|
RU2558831C1 |
METHOD OF BOTTOMHOLE SUPPORT IN WELLS | 2009 |
|
RU2387803C1 |
METHOD OF BOTTOMHOLE CONSOLIDATION IN SLIGHTLY CEMENTED BED | 0 |
|
SU1716092A1 |
METHOD OF BOTTOMHOLE SUPPORT IN SAND WELLS | 2009 |
|
RU2387806C1 |
BOTTOM-HOLE TREATMENT METHOD OF OIL WELL WITH HETEROGENEOUS BEDS AS TO PERMEABILITY | 2008 |
|
RU2368758C1 |
METHOD OF BOTTOMHOLE SUPPORT IN SAND WELLS | 2012 |
|
RU2521236C1 |
METHOD OF FASTENING BOTTOM-HOLE ZONE OF RESERVOIR | 2019 |
|
RU2724828C1 |
PREVENTION METHOD OF SAND RECOVERY, WHEN OPERATING OIL PRODUCTION WELLS | 2016 |
|
RU2626097C1 |
Authors
Dates
2013-06-20—Published
2011-12-22—Filed