FIELD: oil and gas industry.
SUBSTANCE: method involves arrangement of production and injection wells, pumping of displacement liquid through injection wells and extraction of the product through production wells. According to the invention, the first injection well is developed for pumping of displacement liquid with development of interval of oil-water contact (OWC) of the formation. Extraction of the product is performed from production wells with developed oil-saturated intervals of the formation, which envelop it. To the first injection well there performed is cyclic pumping of displacement liquid with 400-500% of compensation of product extraction from production wells enveloping it. After flooding in fractures of one of production wells enveloping the first injection well, isolation of the developed oil-saturated interval of the formation in the same well is performed with development in it of interval of OWC of the formation and with its being changed over to the second injection well for pumping of displacement liquid with 400-500% compensation of the product extraction from production wells enveloping it after flooding in fractures of one of the production wells enveloping the second injection well. Isolation of oil-saturated interval of the formation is performed in the same well with development in it of OWC interval and with its change-over to the third injection well. Gradually, as fractures are being developed, a row of injection wells is created on the oil deposit, to which displacement liquid is pumped. After flooding for 70-80% of production wells enveloping each of the injection wells, that injection well is changed over to extraction of the product after the development interval is changed from OWC to oil-saturated interval of the formation.
EFFECT: increasing the efficiency of the method.
3 ex, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF OIL DEPOSIT IN FRACTURED RESERVOIRS | 2012 |
|
RU2490439C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT BY HORIZONTAL WELLS | 2024 |
|
RU2827198C1 |
METHOD TO DEVELOP OIL POLL WITH OIL-IN-WATER SYSTEMS | 2009 |
|
RU2387812C1 |
METHOD TO DEVELOP OIL POOL | 2011 |
|
RU2463444C1 |
METHOD FOR DEVELOPING AN OIL DEPOSIT COMPLICATED BY A NETWORK OF VERTICAL FRACTURES | 2023 |
|
RU2799828C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2457321C1 |
METHOD FOR DEVELOPMENT OF WATER-FLOODED OIL FORMATION AT LAST STAGE | 2011 |
|
RU2459070C1 |
METHOD OF DEVELOPING OIL DEPOSIT WITH CARBONATE FISSURED RESERVOIRS | 2002 |
|
RU2196885C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT COMPLICATED BY VERTICAL INTERRUPTIONS | 2015 |
|
RU2595105C1 |
METHOD OF DEVELOPING OIL DEPOSITS IN FRACTURED RESERVOIRS WITH WATER OIL ZONES | 2015 |
|
RU2578134C1 |
Authors
Dates
2013-06-20—Published
2011-12-14—Filed