DEVELOPMENT METHOD OF OIL DEPOSIT IN FRACTURED RESERVOIRS Russian patent published in 2013 - IPC E21B43/20 

Abstract RU 2490439 C1

FIELD: oil and gas industry.

SUBSTANCE: method involves arrangement of production and injection wells, pumping of displacement liquid through injection wells and extraction of the product through production wells. The first injection well is developed for pumping of displacement liquid with development of interval of oil-water contact (OWC) of the formation. Extraction of the product is performed from production wells with developed oil-saturated intervals of the formation, which envelop it. At that cyclic pumping of displacement liquid is performed to the first injection well with 100-200% of compensation of product extraction from production wells enveloping it. Then, after flooding in fractures of one of production wells enveloping the first injection well, isolation of the open oil-saturated interval of the formation in the same well is performed with development in it of interval of OWC of the formation and with its being changed over to the second injection well for pumping of displacement liquid with 100-200% compensation of the product extraction from production wells enveloping it after flooding in fractures of one of the production wells enveloping it. After flooding in fractures of one of production wells enveloping the second injection well, isolation of the open oil-saturated interval of the formation in the same well is performed with development in it of interval of OWC of the formation and with its being changed over to the third injection well. Gradually, as fractures are being developed, a row of injection wells is created on the oil deposit, to which displacement liquid is pumped. Periodically polyacrylamide bank is pumped into the injection wells during stops in displacement liquid pumping. When products are flooded per more than 85% in each production well enveloping the injection well, open interval of OWC in this injection well is isolated and horizontal offshoots are drilled from it in the oil-saturated interval perpendicular to direction of fractures development and this well is transferred to product recovery.

EFFECT: prevention of early oil deposit watering and improvement in development of remaining oil stock.

3 ex, 4 dwg

Similar patents RU2490439C1

Title Year Author Number
DEVELOPMENT METHOD OF OIL DEPOSIT IN FRACTURED RESERVOIRS 2011
  • Fajzullin Ilfat Nagimovich
  • Khurrjamov Al'Fis Mansurovich
  • Khurrjamov Bulat Al'Fisovich
  • Ramazanov Rashit Gaznavievich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Farid Bashirovich
RU2485300C1
METHOD OF DEVELOPING OIL DEPOSITS IN FRACTURED RESERVOIRS WITH WATER OIL ZONES 2015
  • Bakirov Ajrat Ilshatovich
  • Muzalevskaja Nadezhda Vasilevna
  • Bakirov Ilshat Mukhametovich
RU2578134C1
METHOD TO DEVELOP OIL POLL WITH OIL-IN-WATER SYSTEMS 2009
  • Abdulmazitov Rafil' Ginijatullovich
  • Ramazanov Rashit Gaznavievich
  • Muzalevskaja Nadezhda Vasil'Evna
  • Jakhina Ol'Ga Aleksandrovna
  • Timergaleeva Ramzija Rinatovna
RU2387812C1
OIL DEPOSIT DEVELOPMENT METHOD 2011
  • Fajzullin Ilfat Nagimovich
  • Khurrjamov Al'Fis Mansurovich
  • Ramazanov Rashit Gaznavievich
  • Sulejmanov Farid Bashirovich
RU2469183C2
METHOD FOR DEVELOPING AN OIL DEPOSIT COMPLICATED BY A NETWORK OF VERTICAL FRACTURES 2023
  • Kalinnikov Vladimir Nikolaevich
  • Emelianov Vitalii Vladimirovich
RU2799828C1
OIL DEPOSIT DEVELOPMENT METHOD 2011
  • Fajzullin Ilfat Nagimovich
  • Khurrjamov Al'Fis Mansurovich
  • Ramazanov Rashit Gaznavievich
  • Sulejmanov Farid Bashirovich
RU2457321C1
METHOD OF DEVELOPING OIL DEPOSIT WITH CARBONATE FISSURED RESERVOIRS 2002
  • Abdulmazitov R.G.
  • Khurrjamov A.M.
  • Mukhametvaleev I.M.
  • Khannanov R.G.
RU2196885C1
METHOD OF OIL FIELD DEVELOPMENT WITH HORIZONTAL WELLS 2014
  • Bakirov Il'Dar Il'Shatovich
  • Muzalevskaja Nadezhda Vasil'Evna
  • Razuvaeva Ol'Ga Vasil'Evna
  • Ibatullina Svetlana Jur'Evna
  • Osnos Vladimir Borisovich
RU2550642C1
METHOD FOR DEVELOPMENT OF DEPOSIT COMPLICATED BY VERTICAL INTERRUPTIONS 2015
  • Petrov Vladimir Nikolaevich
  • Shavaliev Marat Anisovich
  • Khakimzyanov Ilgizar Nurgizarovich
  • Arzamastsev Aleksandr Ivanovich
  • Osnos Liliya Rafagatovna
RU2595105C1
METHOD OF DEVELOPING OIL DEPOSITS 2015
  • Khisamov Rais Salikhovich
  • Petrov Vladimir Nikolaevich
  • Mironova Ljubov Mikhajlovna
  • Salikhov Ilgiz Misbakhovich
  • Sajfutdinov Marat Akhmetzievich
  • Gazizov Ilgam Garifzjanovich
  • Khannanov Mars Talgatovich
RU2578090C1

RU 2 490 439 C1

Authors

Fajzullin Ilfat Nagimovich

Khurrjamov Al'Fis Mansurovich

Khurrjamov Bulat Al'Fisovich

Ramazanov Rashit Gaznavievich

Zijatdinov Radik Zjauzjatovich

Sulejmanov Farid Bashirovich

Dates

2013-08-20Published

2012-02-08Filed