FIELD: mining.
SUBSTANCE: sludge pond dam is built up. Pilot dam 1 is filled to sluice tails on beach 2. Then, beach zone wastes of previous layer are compacted under levee 3 planned to be constructed at beach of previous level. Then, levee material is laid on pre-rolled geotextiles 4. Note here that for levee material storage wastes are used. Wastes from accumulation beach are laid in levee body in layers and compacted. After formation of levee body, it is wrapped in web 4 to make enveloped levee. Building up of the next level, said jobs are reiterated. Note here that reinforced zone 5 is formed along sludge pond levee side.
EFFECT: levee resisting erosion and sufficient durability in emergency.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BUILDUP OF SMALL-SECTION TIRE DAM OF SLUDGE STORAGE | 2016 |
|
RU2615364C1 |
METHOD FOR TIER STOCKING OF GRAIN WASTES INTO SLUDGE POND DRAINED NEAR BASE OF BEACH ZONE | 2009 |
|
RU2410488C1 |
METHOD FOR ERECTION OF SLUDGE POND TIER BUILD-UP DAM | 2009 |
|
RU2392377C1 |
METHOD FOR TIER STOCKING OF GRAIN WASTES INTO SLUDGE POND | 2009 |
|
RU2384669C1 |
METHOD FOR TIER STOCKING OF GRAIN WASTES INTO SLUDGE POND DRAINED NEAR BASE OF BEACH ZONE | 2009 |
|
RU2413051C1 |
WING DIKE FOR FINE-GRAINED WASTE DISPOSAL AREA | 2008 |
|
RU2379416C1 |
METHOD OF ERECTING OF WASHED UP PROTECTIVE DAM | 2009 |
|
RU2421568C1 |
MULTILEVEL HYDRAULICALLY DEPOSITED SLURRY STORAGE | 0 |
|
SU1116114A1 |
METHOD FOR RECLAMATION OF SLUDGE POND COMPARTMENT FILLED WITH GRAINY WASTES OF INDUSTRIAL ENTERPRISES | 2009 |
|
RU2396430C1 |
METHOD TO ERECT EMBANK HYDRAULIC FILL DAM | 2012 |
|
RU2498008C1 |
Authors
Dates
2013-06-27—Published
2011-12-05—Filed