FIELD: construction.
SUBSTANCE: method to erect an embank hydraulic fill dam consists in filling and tiered buildup of an embank dam 1, installation of a manifold and a distributing pulp line 2, tiered concentrated washing of tails to a beach 3 with the help of two process drains 4 and 5 of the pulp line 2. Tails are washed, being separated by their grain-size composition. To wash a section of fine fraction, they open the upper drain 4 of the pulp line 2, and to wash coarse fraction, they open the lower drain 5.
EFFECT: method makes it possible to simplify the process of dam washing and to monitor distribution of grain-size composition of tails on a beach to produce a structure with specified strength parameters.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ERECTION OF ALLUVIAL MAN-MADE DEPOSIT | 2000 |
|
RU2186902C1 |
METHOD OF ERECTING OF WASHED UP PROTECTIVE DAM | 2009 |
|
RU2421568C1 |
METHOD OF ERECTING OF WASHED UP PROTECTIVE DAM | 2010 |
|
RU2421569C1 |
ERECTION METHOD OF ALLUVIAL DAM | 2010 |
|
RU2451131C2 |
METHOD FOR ALLUVIAL DAM ERECTION | 2017 |
|
RU2654718C1 |
METHOD OF CONSTRUCTING A DAM OF LOCALLY AVAILABLE MATERIALS | 0 |
|
SU866032A1 |
METHOD OF UP SLUDGE POND DAM | 2011 |
|
RU2486310C1 |
METHOD OF TAILING DUMP FORMATION | 2000 |
|
RU2162151C1 |
RECULTIVATION METHOD OF COMPARTMENT OF INWASH STORAGE UNIT, WHICH IS FILLED WITH WASTES | 2009 |
|
RU2409743C1 |
WASHED IN COLLECTOR OF WASTES ADJACENT TO SLOPE, METHOD FOR ITS MANUFACTURING AND METHOD OF ITS RECLAMATION | 2009 |
|
RU2398066C1 |
Authors
Dates
2013-11-10—Published
2012-03-01—Filed