FIELD: mining.
SUBSTANCE: method to prepare ore bodies to leaching of useful components in place of bedding includes installation of charges into well rings (11) in the central part of the ore body, explosion of the specified well rings and subsequent injection of a process solution into the central part of the ore body via perforation channels with the branching cracks along periphery of channels, formed by the upper part of the ore body with directed blasting Charges are installed with formation of a water circular gap between an explosive charge, bottom and walls of the well, after formation of a circular gap the well is filled with water or plugged.
EFFECT: invention makes it possible to increase opening of wells and evenness of distribution of a leaching solution in the ore body volume.
2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PREPARING ORE BODIES IN DEPOSITS FOR LEACHING USEFUL COMPONENTS | 2006 |
|
RU2327864C1 |
METHOD TO EXTRACT DISPERSED GOLD FROM REFRACTORY ORES | 2012 |
|
RU2497962C1 |
METHOD OF BREAKING-OFF ORE BODY | 0 |
|
SU1490283A1 |
METHOD FOR DEVELOPMENT OF SOLID ORE AND PREPARATION THEREOF FOR LEACHING | 2015 |
|
RU2593668C1 |
ORE BODY MINING METHOD | 2016 |
|
RU2618541C1 |
METHOD FOR MINING OF INCLINED ORE BODIES | 1994 |
|
RU2069755C1 |
METHOD OF UNDERGROUND MINING OF ORE DEPOSITS | 0 |
|
SU1448052A1 |
METHOD OF BREAKING ORE BODY | 0 |
|
SU1608410A1 |
METHOD OF MINING ORE BODIES | 0 |
|
SU1453004A1 |
METHOD OF MINING THICK ORE DEPOSITS | 0 |
|
SU1709097A1 |
Authors
Dates
2013-10-10—Published
2012-02-29—Filed