FIELD: mining.
SUBSTANCE: within the ore body, the well fans are drilled, charged and short-delayed detonated. The distance between the ends (bottoms) in the fan outer wells and the contour of the ore body is determined taking into account explosive detonation parameters, physical-technical properties and fracture parameters of the ore body, and the magnitude of rock pressure.
EFFECT: size reduction disorders of hosting rocks and ore reduction dilution during its shipment, reducing the volume of the drilling and weight BB.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OBTAINING THE PRESET DEGREE OF CRUSHING OF CRUMBLING ROCK MASS AT GROUP BLASTING OF DEEP-HOLE EXPLOSIVE CHARGES | 2002 |
|
RU2239783C2 |
METHOD OF OBTAINING DETERMINED DEGREE OF CRACKING OF A CRACKY STRESSED ROCK MASSIF IN EXPLOSION OF POWER CHARGES IN TWO PARALLEL CONTIGUOUS WELLS | 2016 |
|
RU2627349C1 |
METHOD FOR DEVELOPING LOW-POWERED STEEL ORE BODIES | 2021 |
|
RU2757619C1 |
METHOD FOR DRIVING OF RAISES WITH ROCK BREAKING BY DEEP-HOLE CHARGES | 2003 |
|
RU2271513C2 |
METHOD FOR DEVELOPING THIN AND LOW-POWERED STEEL-FALLING ORE BODIES | 2021 |
|
RU2762170C1 |
METHOD FOR SHOOTING OF ORES AND ROCKS ON UNDERGROUND MINING WORKS | 2011 |
|
RU2476819C1 |
METHOD OF SETTING OF ALOWABLE MINIMUM THICKNESS OF ORE BODY FOR SUBLEVEL PILLAR-AND-BREAST SYSTEM | 2014 |
|
RU2553819C1 |
METHOD FOR PREPARATION OF ROCK MASS BY BLASTING FOR LEACHING IN SQUEEZED MEDIUM | 1991 |
|
RU2039248C1 |
METHOD OF UNDERGROUND DEVELOPMENT OF THIN VEINS | 2010 |
|
RU2418167C1 |
METHOD OF UNLOADING OF OUTBURST-PRONE ROCK MASS REGIONS BY BLASTING | 2001 |
|
RU2210671C2 |
Authors
Dates
2017-05-04—Published
2016-04-27—Filed