FIELD: information technology.
SUBSTANCE: in one version, a moving time horizon based parametric model provides fast predictions for extraction optimisation in a short-term configuration. In another version, multiple technologies are selected in connection with asset performance workflows that are uniquely implemented in a multi-phase approach.
EFFECT: optimising reservoir extraction operations in real time.
20 cl, 19 dwg, 4 tbl
Title | Year | Author | Number |
---|---|---|---|
PRELIMINARY ANALYSIS OF DRILLING SITE FOR PLANNING OF DEPOSITE MINING | 2008 |
|
RU2489571C2 |
METHOD OF DYNAMIC ESTIMATION OF COMPLIANCE WITH SPECIFICATION OF OIL RESERVOIR, AND INCREASING OF PRODUCTION AND OIL RECOVERY USING ASYMMETRIC ANALYSIS OF OPERATION INDICES | 2011 |
|
RU2571542C2 |
PRODUCTION SIMULATION METHOD AND SYSTEM | 2012 |
|
RU2567067C1 |
METHOD FOR FORECASTING CHANGE IN PRODUCTION RATE OF PRODUCTION WELLS DURING PROPAGATION OF ELASTIC VIBRATIONS IN BOTTOMHOLE FORMATION ZONE | 2020 |
|
RU2740597C1 |
OPTIMISATION METHOD OF THERMAL STEAM IMPACT DURING DEVELOPMENT OF DEPOSIT WITH HIGH-VISCOSITY OILS AND BITUMENS | 2010 |
|
RU2445454C1 |
METHOD FOR DEVELOPING FRACTURED-CAVERNOSIC DEPOSIT WITH GAS CAP AND UNDERLYING WATER | 2022 |
|
RU2808627C1 |
METHOD AND TOOL FOR THE SELECTION OF OPERATING PARAMETERS OF WELLS AT THE MATURE OIL FIELDS FLOODING STAGE | 2017 |
|
RU2681778C2 |
MONITORING AND CONTROL SYSTEM AND METHOD OF WELL FLOW RATE | 2008 |
|
RU2484242C2 |
METHOD FOR ONLINE FORECASTING OF MAIN PARAMETERS OF OIL DEPOSITS DEVELOPMENT | 2011 |
|
RU2480584C1 |
METHOD OF MONITORING DEVELOPMENT OF OIL DEPOSIT WITH NONUNIFORM STRATIFIED FORMATIONS | 2000 |
|
RU2183268C2 |
Authors
Dates
2013-12-20—Published
2008-12-17—Filed