FIELD: construction.
SUBSTANCE: unit for sealing of joints of fencing structures in man-made soil islands includes two vertical slots on the ends of the joined structures, which create a shaft when slots are matched, gaps in which are closed with shields. The inner space of the shaft is filled with a filler. Shields are fixed by means of rotary hinges in slots of each joined structure and are made from a half-pipe. The free edges of the shields adjoining the adjacent structures are equipped with elastic sealing elements.
EFFECT: reduced time for erection of a contouring shell of man-made soil islands, provides for possibility to exclude a stiff joint between joined structures and higher reliability of protection of a soil core of man-made soil islands against erosion.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEFORMATION JOINT | 2004 |
|
RU2268336C1 |
BUILDING STRUCTURE COUPLING JOINT | 0 |
|
SU1760039A1 |
ARTIFICIAL ISLAND | 1989 |
|
RU1739686C |
ARTIFICIAL ISLAND | 2005 |
|
RU2280129C1 |
WATERPROOFING DOWEL | 2021 |
|
RU2757514C1 |
0 |
|
SU1778236A1 | |
JOINT UNIT OF FILLING WINDOW ON DOOR OPENING | 0 |
|
SU1571191A1 |
INTER-SLAB JOINT | 0 |
|
SU1116111A1 |
ARTIFICIAL ISLAND AND METHOD OF INSTALLING SAME | 0 |
|
SU1405379A1 |
WATERTIGHT CHANNEL LINER JOINT | 2005 |
|
RU2282695C1 |
Authors
Dates
2014-01-10—Published
2012-06-26—Filed