FIELD: mining.
SUBSTANCE: method for construction of stowing barricade in mine working involves installation of cast slag blocks on each other throughout the section of the stowed mine working. As cast slag blocks there used are rectangular prisms of similar sizes with bases in the form of sharp-cornered isosceles triangles. Stowing barricade is constructed in horizontal layers, in each layer of which there installed are two rows of cast rectangular prisms; besides, prisms of the first row are laid with their smaller side faces to the stowing mass. Equal side faces of prisms of the first and the second rows are laid tightly to each other, and to smaller side faces of prisms of the second row there installed are anchor posts excluding movement of slag blocks under action of stowing mass.
EFFECT: improving stability of stowing barricade; reducing the time spent on construction of stowing barricade.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
MOVABLE CONNECTION STRAP FOR CREATION OF FILLING MASS IN UNDERGROUND MINE WORKINGS | 2010 |
|
RU2436963C1 |
TRAVELLING BULKHEAD FOR ARRANGEMENT OF FILLING MASS IN UNDERGROUND MINE OPENINGS | 2008 |
|
RU2375579C1 |
ERECTION METHOD OF NON-CUTTING CONNECTION STRAP IN DRIFT WAY MADE IN MOUNTAIN SLOPE | 2012 |
|
RU2503817C1 |
METHOD OF MAKING STOWING BULKHEAD | 2009 |
|
RU2410544C2 |
METHOD FOR CONSTRUCTION OF STOWING BARRICADE IN MINE WORKING | 2011 |
|
RU2484254C1 |
ERECTION METHOD OF FILLING CONNECTION STRAP | 2008 |
|
RU2382883C1 |
PROCEDURE FOR VERTICAL MINE WORKING BACKFILLING | 2010 |
|
RU2427712C1 |
METHOD FOR BACKFILLING VERTICAL COURSE OF COAL MINE | 2005 |
|
RU2290513C1 |
METHOD OF ERECTING A PARTITION | 0 |
|
SU863886A1 |
METHOD OF MINED-OUT SPACE FILLING | 2015 |
|
RU2603992C1 |
Authors
Dates
2014-01-20—Published
2012-07-12—Filed