FIELD: construction.
SUBSTANCE: invention relates to construction and can be used in the mining industry, transport and hydraulic engineering systems, for protection of above-ground and underground spaces that are objects of natural and man-made formations, in the event of the elimination of landslides and depressions, and can also be used to create objects in other terrestrial and extraterrestrial spaces. Device includes a shell with a fast-hardening expanding substance and an explosive. In this case the shell is made of one or more vertical and/or horizontal multi-sectional system of shells, each of which contains a central shell, one or more subsequent shells located behind the central shell, with an explosive and rapidly solidifying expanding substance in the central shell, and in subsequent shells fast-hardening expanding substances, the central and subsequent casings are made of a composite nanomaterial possessing a shape memory system, along the perimeter of the following shells, there are harmonica-like slots made with the possibility of their rupture, and as fast-hardening expanding substance, a composite nanomaterial having a shape memory system is used.
EFFECT: elimination of voids in the Earth's crust, strengthening of soil masses.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FILLING AND PROTECTING EXCAVATED SPACE DURING SUBTERRANEAN EXCAVATION OF MINERAL DEPOSITS | 2002 |
|
RU2232900C2 |
COMPOSITION FOR GOAF PROTECTION AND ENDOGENOUS FIRE PREVENTION | 2007 |
|
RU2334110C1 |
METHOD FOR EXTRACTING DEPOSITS OF WATER-SOLUBLE MINERAL RESOURCES | 2004 |
|
RU2254471C1 |
METHOD OF ORE BODIES DEVELOPMENT | 2007 |
|
RU2352780C1 |
MOVABLE CONNECTION STRAP FOR CREATION OF FILLING MASS IN UNDERGROUND MINE WORKINGS | 2010 |
|
RU2436963C1 |
PROCESS OF BREAKDOWN SITE ISOLATION | 2003 |
|
RU2328600C2 |
URBAN PROTECTIVE SYSTEM DEVICE AND METHOD OF ITS ERECTION | 2015 |
|
RU2604933C2 |
METHOD FOR CONSTRUCTION OF STOWING BARRICADE IN MINE WORKING | 2011 |
|
RU2484254C1 |
TRAVELLING BULKHEAD FOR ARRANGEMENT OF FILLING MASS IN UNDERGROUND MINE OPENINGS | 2008 |
|
RU2375579C1 |
URBAN DEVELOPMENT CONSTRUCTION IN CONDITIONS OF EXTREME NORTH, ARCTIC AND RECREATIONAL ZONES AND METHOD OF ITS ERECTION | 2019 |
|
RU2717453C1 |
Authors
Dates
2018-07-11—Published
2017-08-17—Filed