FIELD: construction.
SUBSTANCE: compound for road surface dressing includes oil sludge and flue ash cenospheres of central heating and power plants with the following ratio of wt, %: oil sludge - 20-80; flue ash cenospheres - 80-20.
EFFECT: improving water repellent and heat-insulating properties.
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ERECT ROAD PAVEMENT OF HIGHWAYS | 2011 |
|
RU2489543C1 |
COMPOUND FOR HIGHWAY PAVING | 0 |
|
SU1682343A1 |
BINDING AGENT BASED ON NEPHELINE SLAG FOR ROAD BUILDING | 2014 |
|
RU2560740C1 |
METHOD FOR UTILIZING OF OIL SLUDGE AND RICE HULL | 2006 |
|
RU2320427C2 |
GROUND CONSOLIDATION COMPOSITION AND METHOD OF ITS USAGE FOR ROAD BUILDING | 2005 |
|
RU2281356C1 |
COMPOSITE STRUCTURAL MATERIAL | 2011 |
|
RU2471737C1 |
METHOD FOR PREPARATION OF ASH-MINERAL MIXTURE FOR BASES OF ROAD PAVEMENTS | 2015 |
|
RU2597903C1 |
TRANSPORT CONSTRUCTION, CONSTRUCTIVE SECTION OF BUILDING AND OF TRANSPORT CONSTRUCTION, METHOD OF ITS ERECTING, REPAIRING AND/OR RECONSTRUCTION AND ASPHALT CONCRETE MIXTURE | 1993 |
|
RU2011727C1 |
BINDER | 1990 |
|
RU2028987C1 |
METHOD FOR ERECTION OF ROAD PAVEMENT | 2007 |
|
RU2351702C1 |
Authors
Dates
2014-01-27—Published
2011-12-09—Filed