FIELD: oil and gas industry.
SUBSTANCE: suggestion refers to remedial cementing of wells at oil deposits, in particular, to plugging of lost-circulation zones, methods of well casing recovery. Method of los-circulation zone plugging includes running-in of cementing string to plugging space. Two components of cementing mixture are pumped in sequence through cementing string until the first component egresses fully in annular space through an open end of cementing string and they are squeezed further by displacement liquid. At that before running-in of cementing string to plugging space packer and cutting sleeve consisting of body with end-to-end channel of circular section with side port and spreader, housing, driving washer are installed additionally. Cementing string is run-in upstream the plugging space per 30 m. Two components of cementing mixture are pumped in sequence until the first component egresses fully in annular space through an open end of cementing string. Packer seating is performed. Squeezing of the second component is continued through cementing string and pressure is increased simultaneously up to 2 MPa, at that driving washer can move and the first component egresses through spreader under pressure to flow of the second component. Components of cementing mixture are squeezed. At that squeezing of the first and second components is made by batches 3-4 times at volume ratio of the components in batches from 1:4 up to 1:1 respectively starting from 1:4 and completing with 1:1. When the last batch of cementing mixture components egresses from the cementing string squeezing is completes, and squeezing of cementing mixture components is made by displacement liquid considering that a cement plug equal to 20 m is to be left in the well. At that stock oil is used as displacement fluid.
EFFECT: improving efficiency of remedial cementing works due to increase of sweep depth, formation of homogenous and dense cementing mixture and due to equal distribution and mixing of pumped components.
1 dwg, 2 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INJECTION OF TWO-COMPONENT COMPOUND TO FORMATION | 2014 |
|
RU2566356C1 |
METHOD OF PRODUCTION STRING SEALING | 2013 |
|
RU2530006C1 |
METHOD FOR WATER INFLUX ZONE ISOLATION INSIDE WELL | 2006 |
|
RU2315171C1 |
PROCEDURE FOR RECOVERY OF TIGHTNESS IN FLOW STRING AND ELIMINATION OF BEHIND-CASING FLOWS | 2013 |
|
RU2518620C1 |
METHOD OF PRODUCTION STRING SEALING | 2013 |
|
RU2520217C1 |
METHOD OF ISOLATING LOST-CIRCULATION FORMATIONS AND RELEVANT DEVICE | 0 |
|
SU1714084A1 |
WELL REPAIR METHOD | 2011 |
|
RU2483193C1 |
METHOD FOR ISOLATION OF LOST CIRCULATION ZONE OF DRILLING MUD DURING OIL AND GAS WELLS | 2023 |
|
RU2825228C1 |
WELL REPAIR METHOD | 2011 |
|
RU2484234C1 |
METHOD OF ISOLATING ABSORBING FORMATIONS | 0 |
|
SU823559A1 |
Authors
Dates
2014-02-10—Published
2012-10-02—Filed