FIELD: oil and gas industry.
SUBSTANCE: curable solution of resin and cement grouting are subsequently pumped. The pumping is performed through the tubing string, the shoe of which is installed as close as possible to the perforation interval, but nor closer than 20 m. The resin cured with a hardener with alkaline or neutral pH values is pumped as resin.
EFFECT: increased strength of plugging stone is achieved due to minimisation as to volume of mixing zone of resinous and cement grouting above the perforation interval.
5 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
WELL REPAIR METHOD | 2011 |
|
RU2484234C1 |
METHOD OF INSULATING WORKS IN PRODUCTION WELL | 2009 |
|
RU2389865C1 |
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL | 2000 |
|
RU2183724C2 |
METHOD OF FORMATION ISOLATION WITH CEMENT-SILICATE MUD | 2012 |
|
RU2519262C1 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
WATER-BEARING BED ISOLATION METHOD | 2005 |
|
RU2299308C2 |
METHOD OF SEGREGATION OF FORMATIONS IN WELL | 1999 |
|
RU2183265C2 |
METHOD FOR ISOLATION WORK PERFORMING IN WELL | 2004 |
|
RU2273723C2 |
METHOD FOR ELIMINATING ANNULAR CIRCULATION | 2023 |
|
RU2808347C1 |
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT | 2017 |
|
RU2661935C1 |
Authors
Dates
2013-05-27—Published
2011-11-29—Filed