FIELD: construction.
SUBSTANCE: method to strengthen slopes of an earth bed includes making of drainage wells, forced removal of water from cavities of the earth bed outside its borders via drainage wells through directed injection of a hardening mortar towards the drainage wells. Previously reinforcing anchor elements are installed into the body of the earth bed, besides, their installation is carried out in tiers and at the angle to each other to form a spatial lattice.
EFFECT: increased quality and efficiency of performed works, increased resistance of soil massif to compressing and shifting loads.
2 cl, 1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
RAILROAD GROUND BED REPAIR METHOD | 2004 |
|
RU2277616C2 |
DEVICE FOR DEEP REINFORCEMENT OF EMBANKMENT SLOPES | 2024 |
|
RU2826962C1 |
METHOD FOR REINFORCING RAILWAY ROADBED IN THE AREA OF JUNCTION WITH AN ARTIFICIAL STRUCTURE | 2020 |
|
RU2752888C1 |
METHOD TO ARRANGE ANTIFILTRATION SCREEN WITH ALTERNATING WATER PERMEABILITY IN OPERATED ROAD EMBANKMENT | 2012 |
|
RU2519239C1 |
DEVICE FOR ROAD EMBANKMENT SLOPE CONSOLIDATION | 2006 |
|
RU2305730C1 |
METHOD OF STRENGTHENING ROAD BED OF AUTOMOBILE ROADS IN PLACES OF CULVERTS | 2015 |
|
RU2588250C1 |
METHOD FOR LIQUIDATION OF ROAD STRUCTURE HEAVING BY CONTROLLED ALKALISATION OF SOIL | 2009 |
|
RU2407859C1 |
METHOD OF STABILISING SOFT GROUND OF ROAD BED AND COMPOSITION TO THIS END | 2010 |
|
RU2474651C2 |
METHOD OF REINFORCING THAW ZONES AT BASE OF STRUCTURES | 2024 |
|
RU2824869C1 |
PROCESS FIXING SLOPE OF SOIL FOUNDATION TRENCH | 2000 |
|
RU2196863C2 |
Authors
Dates
2014-02-20—Published
2012-04-02—Filed