FIELD: oil and gas industry.
SUBSTANCE: method includes drilling of horizontal producers with in-line placement and orientation of horizontal boreholes towards the minimum horizontal stress in the formation, performing multistage hydraulic fracturing and, according to the invention, drilling rows of directional injectors with performance of hydraulic fracturing at all wells in parallel to the lines of horizontal producers with alternation in one row. At that at all injectors located opposite the middle of the producer horizontal boreholes hydraulic fracturing and start-up of operations is made at the stage when operations are started for all other neighbouring wells: production for the nearest horizontal producers in the neighbouring rows and injection for the nearest injectors in the neighbouring rows. Injection to directional injectors is made under the bottomhole pressure that exceeds the fracturing pressure.
EFFECT: reducing oil production decline rate by producers and increasing oil recovery factor.
7 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPING LOW-PERMEABLE DEPOSIT | 2016 |
|
RU2624944C1 |
METHOD FOR DEVELOPING OIL TIGHT DEPOSITS | 2022 |
|
RU2779696C1 |
METHOD FOR DEVELOPING OIL ULTRA-LOW-PERMEABILITY DEPOSITS | 2022 |
|
RU2785044C1 |
METHOD OF DEVELOPING LOW-PERMEABILITY OIL FIELDS BASED ON THE USE OF HORIZONTAL WELLS WITH LONGITUDINAL FRACTURES OF HYDRAULIC FRACTURING | 2017 |
|
RU2660683C1 |
METHOD FOR DEVELOPMENT OF OIL DRAWING WITH REPAIR HYDRAULISM OF PLASTER WITH CHANGE OF DIRECTION OF CRACK | 2017 |
|
RU2666573C1 |
METHOD OF DEVELOPMENT OF LOW-PERMEABLE OIL DEPOSITS | 2013 |
|
RU2547848C2 |
METHOD OF OPERATION OF PRODUCTION AND WATER-BEARING FORMATIONS SEPARATED BY IMPERMEABLE INTERLAYER, WELL WITH HORIZONTAL SHAFTS AND CRACKS OF FORMATION HYDRAULIC FRACTURING | 2016 |
|
RU2630514C1 |
DEVELOPMENT OF LOW-PERMEABILITY OIL DEPOSITS BY HORIZONTAL WELLS UNDER NATURAL CONDITIONS | 2013 |
|
RU2528757C1 |
DEVELOPMENT OF LOW-PERMEABILITY OIL POOLS BY HORIZONTAL WELLS WITH MAINTENANCE OF SEAM PRESSURE | 2013 |
|
RU2526430C1 |
METHOD OF LOW-PERMEABLE OIL DEPOSIT DEVELOPMENT | 2013 |
|
RU2526937C1 |
Authors
Dates
2014-05-20—Published
2013-01-16—Filed