FIELD: oil and gas industry.
SUBSTANCE: penetration of productive strata and subjacent water-bearing beds is made by injectors with subsequent construction and casing perforation, penetration of productive strata by producers with subsequent construction and penetration of the productive stratum, water-flooding of the productive stratum by downhole pumping in injectors from water-bearing beds to the oil-bearing bed, product extraction from the productive stratum through producers. According to the invention water-flooding of the productive stratum is made under permanent pressure with sequential operational delays of injectors less than 4 days. At that pressure compensation by water-flooding at operational delay of the injectors is made due to the closest injectors. In the process of oil production rate decrease, at water-flooding from water-bearing beds pressure compensation is made by water and/or reagents pumping from the mouths of the injectors.
EFFECT: increasing oil recovery of the deposit due to increase in oil displacement efficiency and increase of impact on hard to recover reserves with low drainage in oil-bearing beds.
2 cl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPING AN OIL RESERVOIR IN CARBONATE RESERVOIRS OF BASHKIRIAN STAGE | 2022 |
|
RU2789724C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT LOCATED UNDER GAS DEPOSIT | 2024 |
|
RU2821497C1 |
METHOD FOR DEVELOPING OIL DEPOSIT SITE | 2023 |
|
RU2807319C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2570723C1 |
METHOD FOR DEVELOPMENT OF MULTILAYER OIL DEPOSITS | 2021 |
|
RU2753229C1 |
DEVELOPMENT METHOD OF OIL DEPOSIT BY WATER-FLOODING | 2012 |
|
RU2494237C1 |
METHOD FOR DEVELOPING A MULTILAYER OIL DEPOSIT | 2022 |
|
RU2787500C1 |
MULTIZONE OIL RESERVOIR DEVELOPMENT METHOD | 2006 |
|
RU2303125C1 |
METHOD FOR EXTRACTING OIL DEPOSIT | 2004 |
|
RU2256069C1 |
METHOD OF DEVELOPING OIL DEPOSIT WITH CARBONATE FISSURED RESERVOIRS | 2002 |
|
RU2196885C1 |
Authors
Dates
2014-05-20—Published
2012-12-04—Filed