FIELD: mining.
SUBSTANCE: sinking platform comprises three block platforms connected by props, bin for concrete and bucket funnels. Medium block platform of sinking platform is a movable structure equipped with sliding mounting platform. Two blocks and tackles are suspended from top platform, one to displace tubing over platform periphery and another one to displace in radial direction. Bucket opening of the second block platform is furnished with coverage.
EFFECT: possibility to build up the tubing column, cementing of space between concrete lining and tubing.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
SHAFT SINKING COMBINE | 2015 |
|
RU2600807C1 |
METHOD OF WELL SHAFT CONSTRUCTION, SHAFT SINKING COMBINE, ROCK DESTRUCTION UNIT AND REINFORCING SUPPORT ERECTION DEVICE (VERSIONS) | 2015 |
|
RU2592580C1 |
SHAFT-SINKING PLATFORM | 0 |
|
SU1294995A1 |
COMPLEX FOR CONSTRUCTION OF VERTICAL SHAFTS | 2014 |
|
RU2556764C1 |
SINKING PLATFORM FOR PASSING ROCK WORKINGS | 0 |
|
SU1102963A1 |
DEVICE FOR CONSTRUCTION OF MINE SHAFTS | 1997 |
|
RU2141030C1 |
METHOD FOR INSTALLATION OF TUBBING RINGS AND SUSPENSIONS | 2021 |
|
RU2758137C1 |
SUSPENSION PLATFORM FOR CONSTRUCTING CONCRETE STRUCTURES OF VERTICAL MINE SHAFTS | 0 |
|
SU1320424A1 |
COMPLEX OF EQUIPMENT FOR SINKING SHAFTS BY PARALLEL METHOD | 0 |
|
SU1820001A1 |
METHOD TO CONSTRUCT VERTICAL MINE BY BLASTING AND DRILLING METHOD WITH TUBING LINING AND TUNNELLING COMPLEX FOR METHOD REALISATION | 2012 |
|
RU2493367C1 |
Authors
Dates
2014-05-27—Published
2013-03-04—Filed