FIELD: oil and gas industry.
SUBSTANCE: construction of multihole wells involves drilling of bores in productive formations and well development. Initially, the first bore is drilled in formation of lower productivity. The drilled bore without development is filled with fluid on a hydrocarbon basis forming filter cake not more than 0.5 mm thick. After that, the second bore is drilled in formation with higher productivity, using drill mud. The well is developed by simultaneous stimulation of both formations. At that, fluid on a hydrocarbon basis is used with density not less than density of drill mud used at drilling of the second bore.
EFFECT: decrease of well formation clogging and increase of its productivity.
1 ex
Title | Year | Author | Number |
---|---|---|---|
WELL CONSTRUCTION METHOD | 2010 |
|
RU2429338C1 |
HYDROPHOBIC MICELLAR ACID-BASED COMPOUND FOR KILLING, DEVELOPMENT AND COMPLETION OF PRODUCING STRATA DRILLED WITH USE OF NON-AQUEOUS BASED MUDS | 2014 |
|
RU2540742C1 |
METHOD OF CONDUCTION, FIXATION AND DEVELOPMENT OF MULTIDIRECTIONAL WELL | 2008 |
|
RU2386775C1 |
METHOD OF MULTIHOLE WELL CONSTRUCTION | 2009 |
|
RU2376438C1 |
METHOD OF CONDUCTING, FIXATION AND RECLAMATION OF MULTIDIRECTIONAL WELL | 2008 |
|
RU2386006C1 |
METHOD OF PROCESSING PRIMARILY FLAT HORIZONTAL WELL HOLE FOR REMOVAL OF MUD BULK FROM BOTTOM-HOLE FORMATION ZONE | 2011 |
|
RU2467163C1 |
WELL DRILLING METHOD | 2003 |
|
RU2249089C1 |
COMPOSITION FOR SECONDARILY OPENING PRODUCTIVE OIL BED | 1997 |
|
RU2133258C1 |
DEVELOPMENT METHOD OF MULTI-HOLE BRANCHED HORIZONTAL WELLS | 2011 |
|
RU2459945C1 |
METHOD FOR EXTRACTING MULTI-BED OIL DEPOSIT | 2006 |
|
RU2290493C1 |
Authors
Dates
2014-06-10—Published
2013-07-24—Filed