FIELD: oil and gas industry.
SUBSTANCE: in well construction method involving drilling of old hole on drilling solution and drilling of productive formation on solution for drilling productive formation, drilling solution with addition of RMD-5 reagent in quantity of 2 to 50 wt % is used as solution for drilling of productive formation. At that, drilling of old hole during drilling process of troublesome zones is performed by using drilling solution with addition of RMD-5 reagent in quantity of 2 to 50 wt %, drilling of old hole at availability of multiple troublesome zones is performed by using drilling solution with addition of RMD-5 reagent in quantity of 2 to 50 wt %.
EFFECT: stabilisation of clay fraction of solution, prevention of colmatation of productive formation, and increase in advancing through a bit and drilling speed.
3 cl, 3 ex
Title | Year | Author | Number |
---|---|---|---|
HIGH-EFFICIENCY PROCESS LIQUID FOR OIL INDUSTRY VTZH RMD-5 | 2010 |
|
RU2429268C1 |
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF WELL | 2010 |
|
RU2427709C1 |
RESERVOIR RECOVERY IMPROVEMENT METHOD | 2013 |
|
RU2562634C2 |
METHOD FOR WELL CONSTRUCTION | 2010 |
|
RU2410514C1 |
METHOD OF DEVELOPING AN OIL DEPOSITE | 2020 |
|
RU2743744C1 |
METHOD OF OIL POOL DEVELOPMENT | 2012 |
|
RU2530007C2 |
METHOD OF OIL POOL DEVELOPMENT | 2013 |
|
RU2528183C1 |
DRILLING FLUID FOR FLUSHING OF LONG-DISTANCE STEEPLY INCLINED WELLS UNDER CONDITIONS OF PERMAFROST AND HIGHLY COLLOIDAL CLAY ROCKS, AND ITS APPLICATION METHOD | 2011 |
|
RU2483091C1 |
CONSTRUCTION METHOD OF WELL SHAFT THROUGH UNSTABLE CLAY MINE ROCKS | 2012 |
|
RU2474669C1 |
METHOD FOR PRIMARY PRODUCTIVE BED PENETRATION FOR OIL AND GAS DRILLING | 2003 |
|
RU2283418C2 |
Authors
Dates
2011-09-20—Published
2010-08-18—Filed