BOTTOMHOLE ZONE TREATMENT METHOD FOR HORIZONTAL WELL Russian patent published in 2014 - IPC E21B43/27 E21B43/22 

Abstract RU 2520989 C1

FIELD: oil and gas industry.

SUBSTANCE: bottomhole zone treatment method for a horizontal well includes running-in into the treated bottomhole zone of a hydroperforator with a one-way acting pipe string with nozzles faced upwards, impact of hydrocarbon solvent jet through it, then impact by acid solution, process withhold for reaction with acid, running-out of the equipment from the well, swabbing and bringing the well into production. Before running-in, at the head of a horizontal well, the lower end of the pipe string is equipped bottom upwards with a centralising tube, the one-way acting hydroperforator with nozzles faced upwards, a pulsed liquid pulsator, a valve consisting of a saddle and body with openings covered tightly by the saddle fixed by a shear pin in regards to the body, the pipe string is run in into the bottomhole of a horizontal well until it backs the centralising tube. Then in pulse mode, in two stages, the bottomhole zone is impacted through the hydroperforator at first by a hydrocarbon solution jet, then by a jet of hydrochloric acid. While implementing two stages with simultaneous injection of hydrocarbon solvent or hydrochloric acid the pipe string is moved from the bottomhole to the head at constant speed along the length of the horizontal well screen. When injection of hydrochloric acid is completed the hydroperforator is placed at the well screen end from the well head side, then a plug is set at the head to the pipe string and flushed by process liquid through the pipes till it sets at the valve saddle and the shear pin is destroyed under pressure in the pipe string. Then the process is withhold during 1 hour, at that in process of this withhold the pipe string is run in until the hydroperforator rests in the bottomhole of a horizontal well. Then, during three cycles, 0.5 m3 of process liquid is injected to the pipe string and tubing-casing annulus in turn. When withhold time is over reaction products are washed out by return circulation in one and a halve volume of the well.

EFFECT: effective treatment for bottomhole zone of a horizontal well due to expansion of the stratum area treatment, exclusion of the well screen clogging, reduction of the process duration when this method is implemented.

2 dwg

Similar patents RU2520989C1

Title Year Author Number
METHOD FOR CLEANING AND TREATING BOTTOMHOLE ZONE OF HORIZONTAL WELL IN BITUMEN DEPOSIT 2016
  • Makhmutov Ilgizar Khasimovich
  • Ziyatdinov Radik Zyauzyatovich
  • Mansurov Ajdar Ulfatovich
RU2630938C1
BOTTOMHOLE ZONE TREATMENT METHOD FOR HORIZONTAL WELL 2013
  • Fajzullin Ilfat Nagimovich
  • Khurrjamov Al'Fis Mansurovich
  • Ramazanov Rashit Gaznavievich
  • Gubaev Rim Salikhovich
  • Sulejmanov Farid Bashirovich
RU2527434C1
METHOD OF OIL FORMATION TREATMENT 2013
  • Fajzullin Ilfat Nagimovich
  • Khurrjamov Al'Fis Mansurovich
  • Ramazanov Rashit Gaznavievich
  • Gubaev Rim Salikhovich
  • Sulejmanov Farid Bashirovich
RU2534284C1
TREATMENT METHOD OF BOTTOMHOLE ZONE 2012
  • Fajzullin Ilfat Nagimovich
  • Nabiullin Rustem Fakhrasovich
  • Gusmanov Ajnur Rafkatovich
  • Gubaev Rim Salikhovich
  • Sulejmanov Farid Bashirovich
RU2512216C1
METHOD FOR BOTTOMHOLE SUPPORT IN WELL 2014
  • Kadyrov Ramzis Rakhimovich
  • Sakhapova Alfija Kamilevna
  • Khasanova Dilbarkhon Kelamedinovna
  • Zijatdinov Radik Zjauzjatovich
  • Patlaj Anton Vladimirovich
RU2581861C1
TREATMENT METHOD OF BOTTOMHOLE ZONE 2012
  • Amerkhanov Marat Inkilapovich
  • Vasil'Ev Ehduard Petrovich
  • Shesternin Valentin Viktorovich
  • Beregovoj Anton Nikolaevich
  • Zijatdinov Radik Zjauzjatovich
RU2520221C1
WELL BOTTOMHOLE ZONE TREATMENT METHOD 2018
  • Andaeva Ekaterina Alekseevna
  • Kadyrov Danis Zaditovich
  • Kalinnikov Vladimir Nikolaevich
RU2685366C1
ACIDIZATION PROCESS OF THE BOTTOM-HOLE ZONE OF ACCLINAL OR LATERAL WELL 2007
  • Ibragimov Nail' Gabdulbarievich
  • Taziev Mirgazijan Zakievich
  • Zakirov Ajrat Fikusovich
  • Minnullin Rashit Mardanovich
RU2325517C1
METHOD OF INTERVAL PRODUCTIVE FORMATION TREATMENT IN OPEN HORIZONTAL BORE OF WELL 2016
  • Makhmutov Ilgizar Khasimovich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2618249C1
WELL BOTTOMHOLE ZONE TREATMENT METHOD 2018
  • Andaeva Ekaterina Alekseevna
  • Kadyrov Danis Zaditovich
  • Kumanyaev Vladislav Andreevich
RU2684926C1

RU 2 520 989 C1

Authors

Amerkhanov Marat Inkilapovich

Vasil'Ev Ehduard Petrovich

Beregovoj Anton Nikolaevich

Makhmutov Il'Gizar Khasimovich

Zijatdinov Radik Zjauzjatovich

Dates

2014-06-27Published

2013-03-13Filed